Capacity-filtering algorithms for finite-capacity planning of a flexible flow line

被引:15
作者
Choi, B. K. [1 ]
Seo, J. C. [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, VMS Lab, Taejon 305701, South Korea
关键词
finite capacity planning; flexible flow line; liquid crystal display (LCD) and semiconductor fabrication (Fab); capacity filtering; time bucketing; SEMICONDUCTOR WAFER FABRICATION; JOB-SHOP ENVIRONMENT; RELEASE; POLICIES; MODEL; TIMES; PULL; MRP;
D O I
10.1080/00207540701644201
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses finite-capacity planning (or medium-term scheduling) issues in a flexible flow line such as a semiconductor fabrication (Fab), liquid crystal display (LCD) Fab, or printed circuit board (PCB) Fab. In such a flexible flow line, medium-term schedules such as release schedules and output schedules are critical to achieving the goal of full-capacity and on-time production. However, existing finite-capacity planning methods do not adequately reflect the actual capacity profiles of the Fab. This paper presents capacity-filtering algorithms for generating a finite-capacity loading-profile from an infinite-capacity loadingprofile at a processing stage in a Fab. In addition, two types of finite-capacity planning problems are described, and ways to use the algorithms in solving these problems presented. Performance analyses using a real-life case study show that the proposed method is superior to existing methods. It is postulated that the results presented can be used as a building block for obtaining medium-term schedules for the entire Fab.
引用
收藏
页码:3363 / 3386
页数:24
相关论文
共 41 条
[11]  
Enns ST, 1996, COMPUT IND ENG, V30, P727, DOI 10.1016/0360-8352(96)00025-3
[12]  
GAITHER N., 1999, Production and operations management, V8th
[13]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[14]   A SCHEDULING RULE FOR JOB RELEASE IN SEMICONDUCTOR FABRICATION [J].
GLASSEY, CR ;
RESENDE, MGC .
OPERATIONS RESEARCH LETTERS, 1988, 7 (05) :213-217
[15]  
Goldratt E.M., 1986, RACE, V1st
[16]   Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time [J].
Guinet, AGP ;
Solomon, MM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (06) :1643-1654
[17]   An integrated MRP and JIT framework [J].
Ho, JC ;
Chang, YL .
COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 41 (02) :173-185
[18]  
Hopp W.J., 2000, Factory Physics: Foundations of Manufacturing Management
[19]   Finite-capacity production planning algorithms for a semiconductor wafer fabrication facility [J].
Horiguchi, K ;
Raghavan, N ;
Uzsoy, R ;
Venkateswaran, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (05) :825-842
[20]  
*I2 TECHN, 2006, FACT PLANN GUID