Scheduling with conflicts: online and offline algorithms

被引:52
作者
Even, Guy [1 ]
Halldorsson, Magnus M. [2 ]
Kaplan, Lotem [1 ]
Ron, Dana [1 ]
机构
[1] Tel Aviv Univ, Sch Elect Engn, IL-69978 Tel Aviv, Israel
[2] Univ Iceland, Fac Engn, Dept Comp Sci, Reykjavik, Iceland
关键词
Scheduling with conflicts; Mutual exclusion scheduling; Approximation algorithms; Online algorithms; GRAPHS;
D O I
10.1007/s10951-008-0089-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the following problem of scheduling with conflicts (SWC): Find a minimum makespan schedule on identical machines where conflicting jobs cannot be scheduled concurrently. We study the problem when conflicts between jobs are modeled by general graphs. Our first main positive result is an exact algorithm for two machines and job sizes in {1, 2}. For jobs sizes in {1, 2, 3}, we can obtain a 4/3-approximation, which improves on the 3 2 approximation that was previously known for this case. Our main negative result is that for jobs sizes in {1, 2, 3, 4}, the problem is APX-hard. Our second contribution is the initiation of the study of an online model for SWC, where we present the first results in this model. Specifically, we prove a lower bound of 2-1/m on the competitive ratio of any deterministic online algorithm for m machines and unit jobs, and an upper bound of 2 when the algorithm is not restricted computationally. For three machines we can show that an efficient greedy algorithm achieves this bound. For two machines we present a more complex algorithm that achieves a competitive ratio of 2-1/7 when the number of jobs is known in advance to the algorithm.
引用
收藏
页码:199 / 224
页数:26
相关论文
共 28 条
[1]   A NOTE ON THE DECOMPOSITION OF GRAPHS INTO ISOMORPHIC MATCHINGS [J].
ALON, N .
ACTA MATHEMATICA HUNGARICA, 1983, 42 (3-4) :221-223
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[3]   Mutual exclusion scheduling [J].
Baker, BS ;
Coffman, EG .
THEORETICAL COMPUTER SCIENCE, 1996, 162 (02) :225-243
[4]   Sum multicoloring of graphs [J].
Bar-Noy, A ;
Halldórsson, MM ;
Kortsarz, G ;
Salman, R ;
Shachnai, H .
JOURNAL OF ALGORITHMS, 2000, 37 (02) :422-450
[5]  
Bodlaender H. L., 1993, Mathematical Foundations of Computer Science 1993. 18th International Symposium, MFCS '93 Proceedings, P291
[6]   SCHEDULING WITH INCOMPATIBLE JOBS [J].
BODLAENDER, HL ;
JANSEN, K ;
WOEGINGER, GJ .
DISCRETE APPLIED MATHEMATICS, 1994, 55 (03) :219-232
[7]   RESTRICTIONS OF GRAPH PARTITION PROBLEMS .1. [J].
BODLAENDER, HL ;
JANSEN, K .
THEORETICAL COMPUTER SCIENCE, 1995, 148 (01) :93-109
[8]   OPT versus LOAD in dynamic storage allocation [J].
Buchsbaum, AL ;
Karloff, H ;
Kenyon, C ;
Reingold, N ;
Thorup, M .
SIAM JOURNAL ON COMPUTING, 2004, 33 (03) :632-646
[9]  
COFFMAN EG, 1985, SIAM J COMPUT, V14, P744, DOI 10.1137/0214054
[10]   FIXED-PARAMETER TRACTABILITY AND COMPLETENESS .1. BASIC RESULTS [J].
DOWNEY, RG ;
FELLOWS, MR .
SIAM JOURNAL ON COMPUTING, 1995, 24 (04) :873-921