Scheduling reclaimers serving a stock pad at a coal terminal

被引:25
作者
Kalinowski, Thomas [1 ]
Kapoor, Reena [1 ]
Savelsbergh, Martin W. P. [2 ]
机构
[1] Univ Newcastle, Newcastle, NSW, Australia
[2] Georgia Inst Technol, Atlanta, GA 30332 USA
基金
澳大利亚研究理事会;
关键词
Reclaimer scheduling; Stockyard management; Approximation algorithm; Computational complexity; Branch-and-bound; CONTAINER TERMINALS; YARD CRANE; TIMES;
D O I
10.1007/s10951-016-0495-8
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We study a variant of an abstract scheduling problem inspired by the management of reclaimers in the stockyard of a coal export terminal. We prove NP-completeness of the problem and formulate it as a mixed-integer program. We show that for a given reclaiming sequence, the problem can be solved in pseudo-polynomial time. In addition, we provide simple, constant-factor approximation algorithms as well as exact branch-and-bound algorithms. An extensive computational study analyzes the performance of the algorithms.
引用
收藏
页码:85 / 101
页数:17
相关论文
共 12 条
[1]   A reclaimer scheduling problem arising in coal stockyard management [J].
Angelelli, Enrico ;
Kalinowski, Thomas ;
Kapoor, Reena ;
Savelsbergh, Martin W. P. .
JOURNAL OF SCHEDULING, 2016, 19 (05) :563-582
[2]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[3]   Stacker-reclaimer scheduling in a dry bulk terminal [J].
Hu, Dayong ;
Yao, Zhenqiang .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2012, 25 (11) :1047-1058
[4]   Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals [J].
Kim, KY ;
Kim, KH .
NAVAL RESEARCH LOGISTICS, 2003, 50 (05) :498-514
[5]  
Kim KY, 1999, INT J PROD ECON, V59, P425, DOI 10.1016/S0925-5273(98)00108-X
[6]   Modeling and solving rich quay crane scheduling problems [J].
Legato, Pasquale ;
Trunfio, Roberto ;
Meisel, Frank .
COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (09) :2063-2078
[7]  
Makarychev Y., 2014, THEORETICAL COMPUTER
[8]   An effective heuristic for scheduling a yard crane to handle jobs with different ready times [J].
Ng, WC ;
Mak, KL .
ENGINEERING OPTIMIZATION, 2005, 37 (08) :867-877
[9]   Yard crane scheduling in port container terminals [J].
Ng, WC ;
Mak, KL .
APPLIED MATHEMATICAL MODELLING, 2005, 29 (03) :263-276
[10]   Crane scheduling in container yards with inter-crane interference [J].
Ng, WC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 164 (01) :64-78