Scheduling-based risk estimation and safety planning for construction projects

被引:61
作者
Yi, Kyoo-Jin
Langford, David
机构
[1] Univ Strathclyde, Dept Architecture & Bldg Sci, Glasgow G4 0NG, Lanark, Scotland
[2] Hankyong Natl Univ, Dept Safety Engn, Ansung 456749, Kyonggi Do, South Korea
关键词
D O I
10.1061/(ASCE)0733-9364(2006)132:6(626)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper considers the issue of safety risks on construction sites. It introduces the concept of combined effect of different risk factors to the accident. For proper safety planning, safety managers need to be well aware of the direct causes of the accident as well as indirect factors that adversely effect on site safety. If it is observed that if a hazardous environment exists at the site, then either that hazardous environment must be eliminated or occupations and processes related to that hazard must be properly protected. One of the measures for evading such hazardous situations is to predict such situations and to reschedule the start time of high-risk situation so that risks are not concentrated during certain periods and at certain locations. In order to predict when and where the risk will reach its highest level, analysis should be performed based upon various information including statistical sources such as accident histories and this should be done in coordination with the activity scheduling. This paper analyzes the result of accident history and provides information about vulnerable situations. In addition, it presents a theory of safety planning method which estimates the risk distribution of a project and helps the safety manager to both estimate situations of concentrated risk and then to reschedule it when it is necessary.
引用
收藏
页码:626 / 635
页数:10
相关论文
共 19 条
  • [1] [Anonymous], 2004, Construction Management and Economics
  • [2] *BOMEL LTD, 2003, FALLS HEIGHT PREV RI
  • [3] An algorithm for the implementation of safety improvement programs
    Cagno, E
    Di Giulio, A
    Trucco, P
    [J]. SAFETY SCIENCE, 2001, 37 (01) : 59 - 75
  • [4] Gambatese J., 1999, Automation in construction, V8, P643, DOI [10.1016/S0926-5805, DOI 10.1016/S0926-5805]
  • [5] Gyi D. E., 1999, CONSTRUCTION MANAGEM, V17, P197, DOI DOI 10.1080/014461999371691
  • [6] Integration of virtually real construction model and design-for-safety-process database
    Hadikusumo, BHW
    Rowlinson, S
    [J]. AUTOMATION IN CONSTRUCTION, 2002, 11 (05) : 501 - 509
  • [7] Analysis of construction worker fall accidents
    Huang, XY
    Hinze, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (03): : 262 - 271
  • [8] Fatalities and injuries in the Kuwaiti construction industry
    Kartam, NA
    Bouz, RG
    [J]. ACCIDENT ANALYSIS AND PREVENTION, 1998, 30 (06) : 805 - 814
  • [9] Integrating safety and health performance into construction CPM
    Kartam, NA
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (02): : 121 - 126
  • [10] Construction safety in Kuwait: issues, procedures, problems, and recommendations
    Kartam, NA
    Flood, I
    Koushki, P
    [J]. SAFETY SCIENCE, 2000, 36 (03) : 163 - 184