Stochastic Model of Train Running Time and Arrival Delay: A Case Study of Wuhan-Guangzhou High-Speed Rail

被引:23
|
作者
Lessan, Javad [1 ]
Fu, Liping [1 ,2 ]
Wen, Chao [2 ,3 ]
Huang, Ping [2 ,3 ]
Jiang, Chaozhe [1 ,2 ]
机构
[1] Univ Waterloo, Dept Civil & Environm Engn, Waterloo, ON, Canada
[2] Southwest Jiaotong Univ, Sch Transportat & Logist, Chengdu, Sichuan, Peoples R China
[3] Univ Waterloo, Railway Res Ctr, Waterloo, ON, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
PERFORMANCE;
D O I
10.1177/0361198118780830
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Train operations are subject to stochastic variations, reducing service punctuality and thus the quality of service (QoS). Models of such variations are needed to evaluate and predict the potential impact of disturbances and to avoid service punctuality reduction in train service management and timetabling. In this paper, through a case study of the Wuhan-Guangzhou (WH-GZ) high-speed rail (HSR), we show how a wealth of train operation records can be used to model the stochastic nature of train operations at each level, section and station. Specifically, we examine different distribution models for running times of individual sections and show that the Log-logistic probability density function is the best distributional form to approximate the empirical distribution of running times on the specified line. Next, we show that the distribution of running times in each section can be used to accurately infer arrival delays. Consequently, we construct the underlying analytical model and derive the respective arrival delay distribution at the downstream stations. The results support the correctness of the model presented and show that the proposed model is suitable for constructing the distribution of arrival delays at every station of the specified line. We show that the integrated distribution models of running times and arrival delays, driven by empirical data, can also be used to evaluate the QoS at individual track sections.
引用
收藏
页码:215 / 223
页数:9
相关论文
共 8 条
  • [1] A hybrid model to improve the train running time prediction ability during high-speed railway disruptions
    Huang, Ping
    Wen, Chao
    Fu, Liping
    Peng, Qiyuan
    Li, Zhongcan
    SAFETY SCIENCE, 2020, 122
  • [2] A numerical study of aerodynamic characteristics of a high-speed train with different rail models under crosswind
    Jiang, Zhiwei
    Liu, Tanghong
    Gu, Houyu
    Guo, Zijian
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2021, 235 (07) : 840 - 853
  • [3] High-Speed Railway Opening and Urban Innovation Dividend-A Case Study of Guangzhou Zhuhai Intercity High-Speed Railway
    Cheng, Shuping
    Liu, Jinli
    Xu, Jingxue
    Qiu, Yumin
    LAND, 2023, 12 (01)
  • [4] Physiological responses and stress levels of high-speed rail train drivers under various operating conditions - a simulator study in China
    Jiao, Yubo
    Sun, Zhiqiang
    Fu, Liping
    Yu, Xiaozhuo
    Jiang, Chaozhe
    Zhang, Xiaoming
    Liu, Kun
    Chen, Xiaoyu
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2023, 11 (04) : 449 - 464
  • [5] Numerical study of snow accumulation on the bogies of a high-speed train using URANS coupled with discrete phase model
    Wang, Jiabin
    Gao, Guangjun
    Liu, Mingyang
    Xie, Fei
    Zhang, Jie
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 2018, 183 : 295 - 314
  • [6] Numerical study of dry snow accretion characteristics on the bogie surfaces of a high-speed train based on the snow deposition model
    Cai, Lu
    Lou, Zhen
    Li, Tian
    Zhang, Jiye
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2022, 10 (03) : 393 - 411
  • [7] Unsteady Aerodynamic Characteristics of a High-Speed Train Induced by the Sudden Change of Windbreak Wall Structure: A Case Study of the Xinjiang Railway
    Chen, Zheng-Wei
    Rui, En-Ze
    Liu, Tang-Hong
    Ni, Yi-Qing
    Huo, Xiao-Shuai
    Xia, Yu-Tao
    Li, Wen-Hui
    Guo, Zi-Jian
    Zhou, Lei
    APPLIED SCIENCES-BASEL, 2022, 12 (14):
  • [8] Feature analysis of precipitation-induced subgrade defects on a high-speed rail ballasted track using multiple track inspection data: A case study
    Xiao, Junhua
    Bai, Yingqi
    Song, Chengjie
    Sun, Siqi
    Liu, Xiaozhou
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2024, 238 (07) : 837 - 850