Direct simulation of the tensioning process of cable-stayed bridge cantilever construction

被引:22
作者
Farre-Checa, J. [1 ]
Komarizadehasl, S. [2 ]
Ma, Haiying [3 ,5 ]
Lozano-Galant, J. A. [4 ]
Turmo, J. [2 ]
机构
[1] MOST Enginyers SL, C Raset 34, Barcelona 08021, Spain
[2] Univ Politecn Catalunya BarcelonaTech, Dept Civil & Environm Engn, C Jordi Girona 1-3, Barcelona 08034, Spain
[3] Tongji Univ, Coll Civil Engn, Dept Bridge Engn, Shanghai 200092, Peoples R China
[4] Castilla La Mancha Univ, Dept Civil Engn, Avda Camilo Jose Cela S-N, Ciudad Real 13071, Spain
[5] Shanghai Qizhi Inst, Shanghai 200003, Peoples R China
关键词
Cable-stayed bridges; Cantilever construction; Tensioning process; Objective service stage; Direct analysis; STAGGERED CONSTRUCTION; OPTIMIZATION; ALGORITHM; FORCES;
D O I
10.1016/j.autcon.2022.104197
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction analysis of cable-stayed bridges plays a crucial role in the security of such structures because stresses and deflections attained during construction might exceed those in service. Although some commercial software are capable of simulating this, their main drawback is that they typically apply the stage superposition principle, owing to which the intermediate stages cannot be analyzed independently. Moreover, under this approach, the corrections of the tensioning process due to deviations in the cable stresses measured on site are more difficult. In this study, we conducted a direct simulation of the construction process of cable-stayed bridges built using the cantilever erection method by analyzing independent finite element models. To assure the achievement of a certain target state after construction (objective service stage, (OSS)), the prestressing forces in these models were modeled as imposed strains based on the unstressed length concept. Thus, the construction process can be simulated faster when time dependent phenomena are neglected. Moreover, this will lead to the direct simulation of the construction stages and OSS. To illustrate the application of the proposed method, a cable-stayed bridge was analyzed.
引用
收藏
页数:16
相关论文
共 49 条
[1]   Condition monitoring of bridges with non-contact testing technologies [J].
Abu Dabous, Saleh ;
Feroz, Sainab .
AUTOMATION IN CONSTRUCTION, 2020, 116
[2]   Analysis of Eduardo Torroja's Tempul Aqueduct an important precursor of modern cable-stayed bridges, extradosed bridges and prestressed concrete [J].
Antonio Lozano-Galant, Jose ;
Paya-Zaforteza, Ignacio .
ENGINEERING STRUCTURES, 2017, 150 :955-968
[3]   MODIFICATIONS OF THE STRESS-STATE OF CABLE-STAYED BRIDGES DUE TO STAGGERED CONSTRUCTION OF THEIR SUPERSTRUCTURE [J].
Antonio Lozano-Galant, Jose ;
Ruiz-Ripoll, Lidia ;
Paya-Zaforteza, Ignacio ;
Turmo, Jose .
BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2014, 9 (04) :241-250
[4]   Structural system identification of cable-stayed bridges with observability techniques [J].
Antonio Lozano-Galant, Jose ;
Nogal, Maria ;
Paya-Zaforteza, Ignacio ;
Turmo, Jose .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2014, 10 (11) :1331-1344
[5]   A SUBSTRUCTURE FRONTAL TECHNIQUE FOR CANTILEVER ERECTION ANALYSIS OF CABLE-STAYED BRIDGES [J].
BEHIN, Z ;
MURRAY, DW .
COMPUTERS & STRUCTURES, 1992, 42 (02) :145-157
[6]  
Behin Z., 1990, ERECTION ANAL CABLE
[7]  
Carrillo L., 2015, ERECTION ANAL CABLE
[8]   Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method [J].
Chen, DW ;
Au, FTK ;
Tham, LG ;
Lee, PKK .
COMPUTERS & STRUCTURES, 2000, 74 (01) :1-9
[9]  
Chio G., 2000, THESIS U POLITECNICA
[10]  
Farre-Checa J., 2017, THESIS KTH SCH ARCHI