Hybrid intelligent water drops algorithm to unrelated parallel machines scheduling problem: a just-in-time approach

被引:29
|
作者
Kayvanfar, Vahid [1 ]
Teymourian, Ehsan [2 ]
机构
[1] Amirkabir Univ Technol, Dept Ind Engn, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
关键词
earliness and tardiness; intelligent water drops (IWD) algorithm; unrelated parallel machines; makespan; sequence-dependent set-up time (SDST); EARLINESS-TARDINESS PENALTIES; TOTAL WEIGHTED TARDINESS; COMMON DUE-DATE; SETUP TIMES; NEIGHBORHOOD SEARCH; COMPLETION-TIME; OPTIMIZATION; SEQUENCE; EARLINESS/TARDINESS; MINIMIZATION;
D O I
10.1080/00207543.2014.923124
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Minimising earliness and tardiness penalties as well as maximum completion time (makespan) simultaneously on unrelated parallel machines is tackled in this research. Jobs are sequence-dependent set-up times and due dates are distinct. Since the machines are unrelated, jobs processing time/cost on different machines may vary, i.e. each job could be processed at different processing times with regard to other machines. A mathematical model which minimises the mentioned objective is proposed which is solved optimally via lingo in small-sized cases. An intelligent water drop (IWD) algorithm, as a new swarm-based nature-inspired optimisation one, is also adopted to solve this multi-criteria problem. The IDW algorithm is inspired from natural rivers. A set of good paths among plenty of possible paths could be found via a natural river in its ways from the starting place (source) to the destination which results in eventually finding a very good path to their destination. A comprehensive computational and statistical analysis is conducted to analyse the algorithms' performances. Experimental results reveal that the proposed hybrid IWD algorithm is a trustable and proficient one in finding very good solutions, since it is already proved that the IWD algorithm has the property of the convergence in value.
引用
收藏
页码:5857 / 5879
页数:23
相关论文
共 50 条
  • [31] JUST-IN-TIME SCHEDULING IN IDENTICAL PARALLEL MACHINE SEQUENCE-DEPENDENT GROUP SCHEDULING PROBLEM
    Goli, Alireza
    Keshavarz, Taha
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (06) : 3807 - 3830
  • [32] The maximum deviation just-in-time scheduling problem
    Brauner, N
    Crama, Y
    DISCRETE APPLIED MATHEMATICS, 2004, 134 (1-3) : 25 - 50
  • [33] Batch scheduling problem and algorithm on parallel machines with time bound
    Li, Haixia
    Wang, Zhaoping
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 2, 2011, : 121 - 125
  • [34] Batch Scheduling Problem and Algorithm on Parallel Machines with Time Bound
    Li, Haixia
    Gao, Xiaoli
    Sun, Chuanguang
    2015 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT HUMAN-MACHINE SYSTEMS AND CYBERNETICS IHMSC 2015, VOL I, 2015, : 8 - 10
  • [35] Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
    S. F. Attar
    M. Mohammadi
    R. Tavakkoli-Moghaddam
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 1583 - 1599
  • [36] An Improved Genetic Algorithm For Just-In-Time Job-Shop Scheduling Problem
    Yang, Hongan
    Li, Jinyuan
    Qi, Liangliang
    ADVANCED MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 472-475 : 2462 - 2467
  • [37] A recovering beam search algorithm for the single machine Just-in-Time scheduling problem
    Esteve, B
    Aubijoux, C
    Chartier, A
    T'kindt, V
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 172 (03) : 798 - 813
  • [38] Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times
    Attar, S. F.
    Mohammadi, M.
    Tavakkoli-Moghaddam, R.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (5-8): : 1583 - 1599
  • [39] An iterated greedy algorithm for the large-scale unrelated parallel machines scheduling problem
    Rodriguez, Francisco J.
    Lozano, Manuel
    Blum, Christian
    Garcia-Martinez, Carlos
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (07) : 1829 - 1841
  • [40] JIST: Just-in-time scheduling translation for parallel processors
    Agosta, G
    Reghizzi, SC
    Falauto, G
    Sykora, M
    ISPDC 2004: THIRD INTERNATIONAL SYMPOSIUM ON PARALLEL AND DISTRIBUTED COMPUTING/HETEROPAR '04: THIRD INTERNATIONAL WORKSHOP ON ALGORITHMS, MODELS AND TOOLS FOR PARALLEL COMPUTING ON HETEROGENEOUS NETWORKS, PROCEEDINGS, 2004, : 122 - +