Production planning and simulation for reverse supply chain

被引:6
作者
Murayama, Takeshi
Yoda, Mitsunobu
Eguchi, Toru
Oba, Fuminori
机构
[1] Hiroshima Univ, Div Oral Hlth Engn, Fac Dent, Minami Ku, Hiroshima 7348553, Japan
[2] Hiroshima Univ, Dept Mech Syst Engn, Higashihiroshima 7398527, Japan
关键词
production management; production system; reliability; production planning; supply chain; inverse manufacturing; reverse logistics; reuse;
D O I
10.1299/jsmec.49.281
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes a production planning method for a reverse supply chain, in which a disassembly company takes reusable components from returned used products and supplies the reusable components for a product manufacturer. This method addresses the issue that the timings and quantities of returned products and reusable components obtained from them are unknown. This method first predicts the quantities of returned products and reusable components at each time period by using reliability models. Using the prediction result, the method performs production planning based on Material Requirements Planning (MRP). This method enables us to plan at each time period: the quantity of the products to be disassembled; the quantity of the reusable components to be used; and the quantity of the new components to be produced. The flow of the components and products through a forward and reverse supply chain is simulated to show the effectiveness of the method.
引用
收藏
页码:281 / 286
页数:6
相关论文
共 9 条
  • [1] CLEGG AJ, 1995, PROCEEDINGS OF THE 1995 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT - ISEE, P186, DOI 10.1109/ISEE.1995.514973
  • [2] Quantitative models for reverse logistics: A review
    Fleischmann, M
    BloemhofRuwaard, JM
    Dekker, R
    vanderLaan, E
    vanNunen, JAEE
    VanWassenhove, LN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) : 1 - 17
  • [3] Production planning and control for remanufacturing: a state-of-the-art survey
    Guide, VDR
    Jayaraman, V
    Srivastava, R
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1999, 15 (03) : 221 - 230
  • [4] Production planning and control for remanufacturing: industry practice and research needs
    Guide, VDR
    [J]. JOURNAL OF OPERATIONS MANAGEMENT, 2000, 18 (04) : 467 - 483
  • [5] SCHEDULING DISASSEMBLY
    GUPTA, SM
    TALEB, KN
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) : 1857 - 1866
  • [6] PRAHINSKIA C, IN PRESS OMEGA
  • [7] Disassembly of complex product structures with parts and materials commonality
    Taleb, KN
    Gupta, SM
    Brennan, L
    [J]. PRODUCTION PLANNING & CONTROL, 1997, 8 (03) : 255 - 269
  • [8] TOOMEY JW, 1996, MRPII PLANN MAN EXC
  • [9] UZOY R, 1997, P 1997 IEEE INT S EL, P285