Solving the single crane scheduling problem at rail transshipment yards

被引:20
作者
Li, Xiyu [1 ]
Otto, Alena [1 ]
Pesch, Erwin [1 ,2 ]
机构
[1] Univ Siegen, Chair Management Informat Sci, Kohlbettstr 15, D-57068 Siegen, Germany
[2] HHL Leipzig, Ctr Adv Studies Management CASiM, Jahnallee 59, D-04109 Leipzig, Germany
关键词
Crane scheduling; Transshipment yard; Branch-and-cut; Asymmetric traveling salesman problem with time windows; Minimum completion time problem; TRAVELING SALESMAN PROBLEM; DYNAMIC-PROGRAMMING APPROACH; DEPENDENT SETUP TIMES; MACHINE SCHEDULE; BOUND ALGORITHM; OPERATIONS; TRAINS; JOBS;
D O I
10.1016/j.dam.2018.07.021
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
We consider single-crane scheduling at rail transshipment yards, in which gantry cranes move containers between trains, trucks and a storage area. The single-crane scheduling problem arises at single-crane transshipment terminals and as a subproblem of the multiple-crane scheduling problem. We consider a makespan objective function, which is equivalent to minimizing the train dwell time in the yard, and introduce time windows for container moves, for example, as a customer service promise. Our proposed decomposition algorithm with integrated dynamic branch-and-cut or dynamic programming solves practically relevant instances within short time limits. (C) 2018 Elsevier B.V. All rights reserved.