Generation Expansion Planning Considering Externalities for Large Scale Integration of Renewable Energy

被引:0
|
作者
Khan, Akif Zia [1 ]
Sun Yingyun [1 ]
Ashfaq, Ahsan [1 ]
机构
[1] North China Elect Power Univ, State Key Lab Alternate Elect Power Syst, Beijing, Peoples R China
关键词
Generation Expansion Planning (GEP); Renewable Energy Systems(RES); External Cost of Energy; Genetic Algorithm(GA); Greenhouse Gas(GHG); ELECTRICITY; COSTS; CHINA;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Generation expansion planning (GEP) problem involves determining new power plants in terms of type, capacity and allocation for meeting future load demands. The GEP problem incorporates large number of constraints and it is a highly complex, large scale, non linear optimization problem. Large scale integration of Renewable Energy systems (RES) in GEP problem has always been averted by the high cost and poor availability rates of RES as compared to conventional fossil fuel fired power plants. However internalizing environmental externalities in GEP problem could help to promote large scale integration of RES. The proposed model in this paper examines the effect of internalizing externalities on the GEP problem. External cost values for china are evaluated using the unit damage costs of pollutants. The model has been implemented in MATLAB using Genetic Algorithm and is applied to a case study of one of the district power companies of China. The results show significant structural changes in favor of RES confirming that internalizing externalities can be used as a driving policy tool for large scale integration of RES.
引用
收藏
页码:135 / 140
页数:6
相关论文
共 50 条
  • [31] GENERATION EXPANSION PLANNING INCLUDING THE RENEWABLE ENERGY-SOURCES
    FARGHAL, SA
    AZIZ, MRA
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1988, 3 (03) : 816 - 822
  • [32] Transmission Expansion Planning Test System Considering Transmission and Distribution Coordination with Integration of High Proportion of Renewable Energy
    Li A.
    Liu L.
    Cheng H.
    Liu D.
    Zhang N.
    Xiao J.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2021, 45 (11): : 19 - 27
  • [33] Integration of Large-Scale Renewable Energy into Bulk Power Systems: From Planning to Operation
    Belmans, Ronnie
    ECONOMICS OF ENERGY & ENVIRONMENTAL POLICY, 2019, 8 (02) : 201 - 202
  • [34] Integration of Renewable Energy Sources into Microgrid Considering Operational and Planning Uncertainties
    Menaem, Amir Abdel
    Oboskalov, Vladislav
    INTERNATIONAL SCIENTIFIC CONFERENCE ENERGY MANAGEMENT OF MUNICIPAL FACILITIES AND SUSTAINABLE ENERGY TECHNOLOGIES, EMMFT 2018, VOL 1, 2020, 982 : 225 - 241
  • [35] Robust generation expansion planning considering high penetration renewable energies uncertainty
    Abdalla, Omar H.
    Abu Adma, Maged A.
    Ahmed, Abdelmonem S.
    ENGINEERING REPORTS, 2020, 2 (07)
  • [36] Generation Expansion Planning considering the development of Renewable Zones and Load Distribution Factors
    Godinez, Sergio
    Badaoui, Mohamed
    Avila Camarena, Jesus
    Fuerte-Esquivel, Claudio R.
    9TH INTERNATIONAL YOUTH CONFERENCE ON ENERGY, IYCE 2024, 2024,
  • [37] A Generation Expansion Planning Method for Power Systems With Large-scale New Energy
    Wang J.
    Li Q.
    Wang X.
    Huang Q.
    Liu S.
    Qian T.
    Cao X.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2020, 40 (10): : 3114 - 3123
  • [38] BARRIERS TO LARGE-SCALE RENEWABLE ENERGY GENERATION
    Leyland, Bryan
    ENERGY & ENVIRONMENT, 2009, 20-21 : 1243 - 1247
  • [39] ENERGY GENERATION EXPANSION PLANNING MODEL CONSIDERING EMISSIONS CONSTRAINTS
    Mejia Giraldo, Diego Adolfo
    Lopez Lezaivia, Jesus Maria
    Gallego Pareja, Luis Alfonso
    DYNA-COLOMBIA, 2010, 77 (163): : 75 - 84
  • [40] Low-carbon generation expansion planning considering uncertainty of renewable energy at multi-time scales
    Yuanze Mi
    Chunyang Liu
    Jinye Yang
    Hengxu Zhang
    Qiuwei Wu
    Global Energy Interconnection, 2021, 4 (03) : 261 - 272