Ultra-rapid delivery of specialty fi eld hospitals to combat COVID-19: Lessons learned from the Leishenshan Hospital project in Wuhan

被引:95
作者
Luo, Hanbin [1 ]
Liu, Jiajing [1 ]
Li, Chengqian [1 ]
Chen, Ke [1 ]
Zhang, Ming [2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil Engn & Mech, Dept Construct Management, Wuhan, Hubei, Peoples R China
[2] Cent South Architectural Design Inst, Wuhan, Hubei, Peoples R China
关键词
Infectious disease field hospital construction; Wuhan Leishenshan Hospital; Building information modeling (BIM); COVID-19; BIM IMPLEMENTATION; CONSTRUCTION; DESIGN; INFORMATION; COLLABORATION;
D O I
10.1016/j.autcon.2020.103345
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the outbreak of the 2019 novel coronavirus (COVID-19) epidemic in Wuhan, China, in January 2020, the escalating number of confirmed and suspected cases overwhelmed the admission capacity of the designated hospitals. Two specialty field hospitals-Huoshenshan and Leishenshan-were designed, built and commissioned in record time (9-12 days) to address the outbreak. This study documents the design and construction of Leishenshan Hospital. Based on data collected from various sources such as the semi-structured interviews of key stakeholders from Leishenshan Hospital, this study found that adhering to a product, organization, and process (POP) modeling approach combined with building information modeling (BIM) allowed for the ultra-rapid creation, management, and communication of project-related information, resulting in the successful develop-ment of this fully functional, state-of-the-art infectious disease specialty hospital. With the unfortunate ongoing international COVID-19 outbreak, many countries and regions face similar hospital capacity problems. It is thus expected that the lessons learned from the design, construction and commissioning of Leishenshan Hospital can provide a valuable reference to the development of specialty field hospitals in other countries and regions.
引用
收藏
页数:10
相关论文
共 38 条
  • [1] AGC, 2019, LEV DEV SPEC
  • [2] Bakowski J., 2016, Int J SAFE, V6, P746, DOI [https://doi.org/10.2495/SAFE-V6-N4-746-754, DOI 10.2495/SAFE-V6-N4-746-754]
  • [3] How to measure the benefits of BIM - A case study approach
    Barlish, Kristen
    Sullivan, Kenneth
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 24 : 149 - 159
  • [4] A UNIFIED APPROACH FOR MODELING CONSTRUCTION INFORMATION
    BJORK, BC
    [J]. BUILDING AND ENVIRONMENT, 1992, 27 (02) : 173 - 194
  • [5] Use of an innovative design mobile hospital in the medical response to Hurricane Katrina
    Blackwell, Thomas
    Bosse, Michael
    [J]. ANNALS OF EMERGENCY MEDICINE, 2007, 49 (05) : 580 - 588
  • [6] The project benefits of Building Information Modelling (BIM)
    Bryde, David
    Broquetas, Marti
    Volm, Juergen Marc
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (07) : 971 - 980
  • [7] Hospital Emergency Management Plan During the COVID-19 Epidemic
    Cao, Yubin
    Li, Qin
    Chen, Jing
    Guo, Xia
    Miao, Cheng
    Yang, Hui
    Chen, Zihang
    Li, Chunjie
    Li, Longjiang
    [J]. ACADEMIC EMERGENCY MEDICINE, 2020, 27 (04) : 309 - 311
  • [8] Bridging BIM and building (BBB) for information management in construction The underlying mechanism and implementation
    Chen, Ke
    Lu, Weisheng
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (07) : 1518 - 1532
  • [9] Development and application of a specification-compliant highway tunnel facility management system based on BIM
    Chen, Lijuan
    Shi, Peixin
    Tang, Qiang
    Liu, Wei
    Wu, Qinglin
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [10] A BIM-based construction quality management model and its applications
    Chen, LiJuan
    Luo, Hanbin
    [J]. AUTOMATION IN CONSTRUCTION, 2014, 46 : 64 - 73