Supporting quick response through scheduling of make-to-stock production/inventory systems

被引:13
作者
Johnson, ME [1 ]
Scudder, G [1 ]
机构
[1] Vanderbilt Univ, Owen Grad Sch Management, Nashville, TN 37203 USA
关键词
D O I
10.1111/j.1540-5915.1999.tb01617.x
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Scheduling of traditional job shops in make-to-order systems has seen extensive research over the past three decades. In such systems, performance is often related to various job completion metrics such as average flow time, average lateness, etc. This paper examines a scheduling problem in a make-to-stock environment where individual job completion measures are irrelevant. In this case, customer orders are satisfied through on-hand inventory where customer service is more closely related to the manufacturer's ability to quickly satisfy demand. We consider the role of scheduling in reducing inventories and improving customer service in the context of a manufacturer who assembles several different products on a single assembly line. We develop scheduling rules for such a system and experimentally compare their performance to those typically used in such environments. Our results indicate that rules which consider the inventory position and demand forecast outperform traditional fixed cycle rules.
引用
收藏
页码:441 / 467
页数:27
相关论文
共 17 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]  
Banks J., 2009, DISCRETE EVENT SYSTE, V5th
[3]   THE STRATEGIC USE OF CAPACITY SLACK IN THE ECONOMIC LOT SCHEDULING PROBLEM WITH RANDOM DEMAND [J].
BOURLAND, KE ;
YANO, CA .
MANAGEMENT SCIENCE, 1994, 40 (12) :1690-1704
[4]   The product cycling problem under increasing yield rates [J].
Bourland, KE ;
Brown, MJ ;
Yano, CA .
IIE TRANSACTIONS, 1997, 29 (05) :417-422
[5]   A comparison of solution approaches for the fixed-sequence economic lot scheduling problem [J].
Bourland, KE ;
Yano, CA .
IIE TRANSACTIONS, 1997, 29 (02) :103-108
[6]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[7]   A HIERARCHICAL APPROACH FOR CAPACITY COORDINATION IN MULTIPLE PRODUCTS SINGLE-MACHINE PRODUCTION SYSTEMS WITH STATIONARY STOCHASTIC DEMANDS [J].
FRANSOO, JC ;
SRIDHARAN, V ;
BERTRAND, JWM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 86 (01) :57-72
[8]   SCHEDULING THE PRODUCTION OF SEVERAL ITEMS WITH RANDOM DEMANDS IN A SINGLE FACILITY [J].
GALLEGO, G .
MANAGEMENT SCIENCE, 1990, 36 (12) :1579-1592
[9]   A NOTE ON IMPROVING THE PERFORMANCE OF THE ENHANCED DYNAMIC CYCLE LENGTHS HEURISTIC FOR THE MULTIITEM, SINGLE-MACHINE SCHEDULING PROBLEM [J].
GASCON, A ;
LEACHMAN, RC ;
LEFRANCOIS, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (03) :869-873
[10]   MULTIITEM, SINGLE-MACHINE SCHEDULING PROBLEM WITH STOCHASTIC DEMANDS - A COMPARISON OF HEURISTICS [J].
GASCON, A ;
LEACHMAN, RC ;
LEFRANCOIS, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (03) :583-596