A survey of case studies in production scheduling: Analysis and perspectives

被引:69
作者
Fuchigami, Helio Yochihiro [1 ,2 ]
Rangel, Socorro [3 ]
机构
[1] Fed Univ Goias UFG, Fac Sci & Technol FCT, Campus Aparecida Goiania, Goiania, Go, Brazil
[2] Sao Paulo State Univ Unesp, Inst Biosci Humanities & Exact Sci Ibilce, Campus Sao Jose do Rio Preto, Sao Jose Do Rio Preto, Brazil
[3] Sao Paulo State Univ Unesp, Inst Biosci Humanities & Exact Sci Ibilce, Campus Sao Jose, Sao Jose Do Rio Preto, Brazil
基金
巴西圣保罗研究基金会;
关键词
Operational research; Production scheduling; Production sequencing; Case studies; HYBRID FLOW-SHOP; FLEXIBLE JOB-SHOP; SIMULATION-OPTIMIZATION APPROACH; TOTAL-ENERGY CONSUMPTION; TOTAL WEIGHTED TARDINESS; DEPENDENT SETUP TIMES; GENETIC ALGORITHM; PARALLEL MACHINES; SEARCH ALGORITHM; MILP MODEL;
D O I
10.1016/j.jocs.2017.06.004
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problems of production scheduling and sequencing refer to decision making regarding the designation of jobs to available resources and their subsequent order to optimize pre-defined performance measures. From the early days of research in this area until this last decade, the publication of case studies has been scarce, with their frequency only increasing very recently. This survey aims to highlight practical research and case studies published in the literature in the scheduling area, identifying the main characteristics of the problems treated, trends in this research and also gaps showing potential areas for future study. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:425 / 436
页数:12
相关论文
共 94 条
[1]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[2]   Production planning and scheduling in the glass container industry: A VNS approach [J].
Almada-Lobo, Bernardo ;
Oliveira, Jose F. ;
Carravilla, Maria Antonia .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (01) :363-375
[3]   A heuristic to schedule flexible job-shop in a glass factory [J].
Alvarez-Valdes, R ;
Fuertes, A ;
Tamarit, JM ;
Giménez, G ;
Ramos, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) :525-534
[4]  
Alves Fernanda de Freitas, 2016, Gest. Prod., V23, P204, DOI 10.1590/0104-530X2196-15
[5]  
[Anonymous], 2016, SCHEDULING THEORY AL, DOI DOI 10.1007/978-3-319-26580-3
[6]   The energy scheduling problem: Industrial case-study and constraint propagation techniques [J].
Artigues, Christian ;
Lopez, Pierre ;
Hait, Alain .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 143 (01) :13-23
[7]   Algorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing times [J].
Aydilek, Asiye ;
Aydilek, Harun ;
Allahverdi, Ali .
APPLIED MATHEMATICAL MODELLING, 2017, 45 :982-996
[8]   A review of TSP based approaches for flowshop scheduling [J].
Bagchi, TP ;
Gupta, JND ;
Sriskandarajah, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (03) :816-854
[9]  
Baker K. R., 1974, Introduction to Sequencing and Scheduling"
[10]   Scheduling batches in flowshop with limited buffers in the shampoo industry [J].
Belaid, R. ;
T'kindt, V. ;
Esswein, C. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 223 (02) :560-572