共 37 条
[11]
Hill A., 2015, P OFFSH TECHN C HOUS
[12]
Hynes-Griffin M. E., 1984, GL8413 USA ENG WAT E
[13]
Predicting the stand-up time of temporary London Clay slopes at Terminal 5, Heathrow Airport
[J].
GEOTECHNIQUE,
2007, 57 (01)
:63-74
[14]
KOVACEVIC N, 2004, ADV GEOTECHNICAL ENG, V2, P842
[16]
Lo K.Y., 1972, CAN GEOTECH J, V9, P407, DOI [10.1139/t72-042, DOI 10.1139/T72-042]
[17]
LO KY, 1973, GEOTECHNIQUE, V23, P1
[19]
Locat A, 2011, CAN GEOTECH J, V48, P1696, DOI [10.1139/t11-059, 10.1139/T11-059]
[20]
Submarine landslides: processes, triggers and hazard prediction
[J].
PHILOSOPHICAL TRANSACTIONS OF THE ROYAL SOCIETY A-MATHEMATICAL PHYSICAL AND ENGINEERING SCIENCES,
2006, 364 (1845)
:2009-2039