Skipping Strategy (SS) for Initial Population of Job-Shop Scheduling Problem

被引:0
作者
Abdolrazzagh-Nezhad, M. [1 ]
Nababan, E. B. [2 ]
Sarim, H. M. [3 ]
机构
[1] Bozorgmehr Univ Qaenat, Fac Engn, Dept Comp Engn, Qaen, Iran
[2] Univ Sumatera Utara, Fac Comp Sci & Informat Technol, Dept Informat Technol, Medan, Indonesia
[3] Univ Kebangsaan Malaysia, Ctr Artificial Intelligence Technol, Data Min & Optimizat Res Grp, Ukm Bangi 43600, Selangor, Malaysia
来源
2ND INTERNATIONAL CONFERENCE ON COMPUTING AND APPLIED INFORMATICS 2017 | 2018年 / 978卷
关键词
ALGORITHM; OPTIMIZATION;
D O I
10.1088/1742-6596/978/1/012054
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Initial population in job-shop scheduling problem (JSSP) is an essential step to obtain near optimal solution. Techniques used to solve JSSP are computationally demanding Skipping strategy (SS) is employed to acquire initial population after sequence of job on machine and sequence of operations (expressed in Plates jobs and mPlates-jobs) are determined. The proposed technique is applied to benchmark datasets and the results are compared to that of other initialization techniques. It is shown that the initial population obtained from the SS approach could generate optimal solution.
引用
收藏
页数:7
相关论文
共 50 条
  • [1] Dynamic heuristics for the generalized job-shop scheduling problem
    Ghedjati, Fatima
    Portmann, Marie-Claude
    2009 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC 2009), VOLS 1-9, 2009, : 2562 - +
  • [2] Identifying and exploiting commonalities for the job-shop scheduling problem
    Kammer, Marnix
    van den Akker, Marjan
    Hoogeveen, Han
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (11) : 1556 - 1561
  • [3] A New Genetic Algorithms Combined with Learning Strategy for Flexible Job-Shop Scheduling Problem
    Xie, Shi-man
    ADVANCED TECHNOLOGY IN TEACHING - PROCEEDINGS OF THE 2009 3RD INTERNATIONAL CONFERENCE ON TEACHING AND COMPUTATIONAL SCIENCE (WTCS 2009), VOL 2: EDUCATION, PSYCHOLOGY AND COMPUTER SCIENCE, 2012, 117 : 153 - 161
  • [4] Flexible job-shop scheduling problem with resource recovery constraints
    Vallikavungal Devassia, Jobish
    Angelica Salazar-Aguilar, M.
    Boyer, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (09) : 3326 - 3343
  • [5] An artificial immune algorithm for the flexible job-shop scheduling problem
    Bagheri, A.
    Zandieh, M.
    Mahdavi, Iraj
    Yazdani, M.
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2010, 26 (04): : 533 - 541
  • [6] Exploring Problem State Transformations to Enhance Hyper-heuristics for the Job-Shop Scheduling Problem
    Garza-Santisteban, Fernando
    Amaya, Ivan
    Cruz-Duarte, Jorge
    Carlos Ortiz-Bayliss, Jose
    Ozcan, Ender
    Terashima-Marin, Hugo
    2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
  • [7] NEURAL NETWORKS FOR JOB-SHOP SCHEDULING
    WILLEMS, TM
    ROODA, JE
    CONTROL ENGINEERING PRACTICE, 1994, 2 (01) : 31 - 39
  • [8] Scatter search algorithm for the multiprocessor task job-shop scheduling problem
    Fan, Kun
    Wang, Meng
    Zhai, Yafei
    Li, Xinning
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 127 : 677 - 686
  • [9] A variable neighbourhood search algorithm for the flexible job-shop scheduling problem
    Amiri, M.
    Zandieh, M.
    Yazdani, M.
    Bagheri, A.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (19) : 5671 - 5689
  • [10] The flexible job-shop scheduling problem considering deterioration effect and energy consumption simultaneously
    Wu, Xiuli
    Shen, Xianli
    Li, Congbo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 135 : 1004 - 1024