共 52 条
[4]
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theory of NP-Completeness
[5]
Asfahl C.R., 1992, Robots and Manufacturing Automation, V2nd
[6]
BRAUNER N, 1997, RR982I I IMAG LAB LE
[8]
Multicyclic hoist scheduling with constant processing times
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
2002, 18 (01)
:69-80
[9]
Cyclic scheduling of a hoist with time window constraints
[J].
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION,
1998, 14 (01)
:144-152