Current status and technical description of Chinese 2 x 250 MWth HTR-PM demonstration plant

被引:385
作者
Zhang, Zuoyi [1 ]
Wu, Zongxin [1 ]
Wang, Dazhong [1 ]
Xu, Yuanhui [1 ]
Sun, Yuliang [1 ]
Li, Fu [1 ]
Dong, Yujie [1 ]
机构
[1] Tsinghua Univ, Inst Nucl & New Energy Technol, Beijing 100084, Peoples R China
关键词
D O I
10.1016/j.nucengdes.2009.02.023
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
After the nuclear accidents of Three Mile Island and Chernobyl the world nuclear community made great efforts to increase research on nuclear reactors and to develop advanced nuclear power plants with much improved safety features. Following the successful construction and a most gratifying operation of the 10 MWth high-temperature gas-cooled test reactor (HTR-10), the Institute of Nuclear and New Energy Technology (INET) of Tsinghua University has developed and designed an HTR demonstration plant, called the HTR-PM (high-temperature-reactor pebble-bed module). The design, having jointly been carried out with industry partners from China and in collaboration of experts worldwide, closely follows the design principles of the HTR-10. Due to intensive engineering and R&D efforts since 2001, the basic design of the HTR-PM has been finished while all main technical features have been fixed. A Preliminary Safety Analysis Report (PSAR) has been compiled. The HTR-PM plant will consist of two nuclear steam supply system (NSSS), so called modules, each one comprising of a single zone 250 MW,h pebble-bed modular reactor and a steam generator. The two NSSS modules feed one steam turbine and generate an electric power of 210 MW. A pilot fuel production line will be built to fabricate 300,000 pebble fuel elements per year. This line is closely based on the technology of the HTR-10 fuel production line. The main goals of the project are two-fold. Firstly, the economic competitiveness of commercial HTR-PM plants shall be demonstrated. Secondly, it shall be shown that HTR-PM plants do not need accident management procedures and will not require any need for offsite emergency measures. According to the current schedule of the project the completion date of the demonstration plant will be around 2013. The reactor site has been evaluated and approved; the procurement of long-lead components has already been started. After the successful operation of the demonstration plant, commercial HTR-PM plants are expected to be built at the same site. These plants will comprise many NSSS modules and, correspondingly, a larger turbine. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:1212 / 1219
页数:8
相关论文
共 8 条
[1]  
Idaho National Laboratory, 2007, INLEXT0712967
[2]  
International Atomic Energy Agency, 2001, IAEATECDOC1198
[3]   ADVANTAGES OF GOING MODULAR IN HTRS [J].
REUTLER, H ;
LOHNERT, GH .
NUCLEAR ENGINEERING AND DESIGN, 1984, 78 (02) :129-136
[4]  
*US DOE, 2002, TECHN ROADM GEN, V4
[5]   The design features of the HTR-10 [J].
Wu, ZX ;
Lin, DC ;
Zhong, DX .
NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) :25-32
[6]   Economic potential of modular reactor nuclear power plants based on the Chinese HTR-PM project [J].
Zhang, Zuoyi ;
Sun, Yuhang .
NUCLEAR ENGINEERING AND DESIGN, 2007, 237 (23) :2265-2274
[7]   Design aspects of the Chinese modular high-temperature gas-cooled reactor HTR-PM [J].
Zhang, ZY ;
Wu, ZX ;
Sun, YL ;
Li, F .
NUCLEAR ENGINEERING AND DESIGN, 2006, 236 (5-6) :485-490
[8]   Future HTGR developments in China after the criticality of the HTR-10 [J].
Zhang, ZY ;
Yu, SY .
NUCLEAR ENGINEERING AND DESIGN, 2002, 218 (1-3) :249-257