A Multi-objective Hospital Operating Room Planning and Scheduling Problem Using Compromise Programming

被引:1
作者
Duenas, Alejandra [1 ]
Di Martinelly, Christine [1 ]
Tutuncu, G. Yazgi [1 ,2 ]
Aguado, Joaquin [3 ]
机构
[1] LEM CNRS, IESEG, Sch Management, 3 Rue Digue, F-59000 Lille, France
[2] Izmir Univ Econ, Dept Math, Sakarya Cad 156 Balcova, Izmir, Turkey
[3] Univ Bamberg, Bamberg, Germany
来源
ADVANCES IN COMPUTATIONAL INTELLIGENCE, MICAI 2016, PT I | 2017年 / 10061卷
关键词
Multi-objective optimization; Compromise programming; Mixed integer programming; Local search; Operating room scheduling; CRITERIA; SURGERY; ALGORITHM; THEATER; DEMAND;
D O I
10.1007/978-3-319-62434-1_31
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes a hybrid compromise programming local search approach with two main characteristics: a capacity to generate non-dominated solutions and the ability to interact with the decision maker. Compromise programming is an approach where it is not necessary to determine the entire set of Pareto-optimal solutions but only some of them. These solutions are called compromise solutions and represent a good tradeoff between conflicting objectives. Another advantage of this type of method is that it allows the inclusion of the decision maker's preferences through the definition of weights included in the different metrics used by the method. This approach is tested on an operating room planning process. This process incorporates the operating rooms and the nurse planning simultaneously. Three different objectives were considered: to minimize operating room costs, to minimize the maximum number of nurses needed to participate in surgeries and to minimize the number of open operating rooms. The results show that it is a powerful decision tool that enables the decision makers to apply compromise alongside optimal solutions during an operating room planning process.
引用
收藏
页码:379 / 390
页数:12
相关论文
共 50 条
[41]   Solving Multi-Objective Economic Dispatch Problem Via Semidefinite Programming [J].
Jubril, Abimbola M. ;
Komolafe, Olusola A. ;
Alawode, Kehinde O. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (03) :2056-2064
[42]   MULTI-OBJECTIVE FLEXIBLE JOB SHOP SCHEDULING PROBLEM WITH CARBON EMISSIONS [J].
Zhang, Guo-Hui ;
Dang, Shi-Jie ;
Deng, Xiang .
ENERGY AND MECHANICAL ENGINEERING, 2016, :946-952
[43]   Multi-objective scheduling and a resource allocation problem in hospitals [J].
Jeric, Silvija Vlah ;
Figueira, Jose Rui .
JOURNAL OF SCHEDULING, 2012, 15 (05) :513-535
[44]   An Evolutionary Approach for Multi-Objective Optimization in Cyclic Hoist Scheduling Problem [J].
El Amraoui, Adnen ;
Mesghouni, Khaled .
2014 INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2014, :201-206
[45]   An interactive fuzzy programming approach for a new multi-objective multi-product oil pipeline scheduling problem [J].
Goudarzi, F. Khalili ;
Maleki, H. R. ;
Niroomand, S. .
IRANIAN JOURNAL OF FUZZY SYSTEMS, 2021, 18 (04) :95-112
[46]   Solving Multiprocessor Scheduling Problem Using Multi-objective Mean Field Annealing [J].
Lotfi, Nasser ;
Acan, Adnan .
14TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI), 2013, :113-118
[47]   Multi-objective preventive maintenance and replacement scheduling in a manufacturing system using goal programming [J].
Moghaddam, Kamran S. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 146 (02) :704-716
[48]   Multi-objective production scheduling and workforce planning in sustainable reconfigurable manufacturing system [J].
Ostovari, Alireza ;
Benyoucef, Lyes ;
Haddou-Benderbal, Hichem .
INTERNATIONAL JOURNAL OF INTERACTIVE DESIGN AND MANUFACTURING - IJIDEM, 2025, 19 (05) :3803-3823
[49]   A multi-objective memetic algorithm for integrated process planning and scheduling [J].
Jin, Liangliang ;
Zhang, Chaoyong ;
Shao, Xinyu ;
Yang, Xudong ;
Tian, Guangdong .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8) :1513-1528
[50]   A multi-objective memetic algorithm for integrated process planning and scheduling [J].
Liangliang Jin ;
Chaoyong Zhang ;
Xinyu Shao ;
Xudong Yang ;
Guangdong Tian .
The International Journal of Advanced Manufacturing Technology, 2016, 85 :1513-1528