Integrating production planning and maintenance: an iterative method

被引:39
作者
Zhao, Shixiong [1 ]
Wang, Liya [1 ]
Zheng, Yu [2 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn & Management, Shanghai 200030, Peoples R China
[2] Shanghai Jiao Tong Univ, Comp Integrated Mfg Inst, Shanghai 200030, Peoples R China
关键词
Availability; Integrated planning; Iteration; Nonlinear constraints; Preventive maintenance; Production management; LOT-SIZING PROBLEM; PREVENTIVE MAINTENANCE; HIERARCHICAL PRODUCTION; OPTIMIZATION APPROACH; MODEL; POLICIES; STRATEGY; SUBJECT;
D O I
10.1108/IMDS-07-2013-0314
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Purpose - Making decisions on production and maintenance separately, as is often done in practice and research literature, may not result in overall optimization. This paper aims to propose a joint method that better integrates production planning and maintenance at the tactical level. The potential of improving the performance of the classic planning method is also explored. Design/methodology/approach - An integrated production planning and maintenance model is proposed. The production capacity losses resulted from both preventive and corrective maintenance activities are considered. Meanwhile, the reliability deterioration of the machine is considered to be operation dependent. An iterative approach is presented to find a solution for the nonlinear model through iteratively solving a sequence of mixed integer linear programming instances, accompanied by modification of some parameters prior to each iteration. Computational experiments are conducted to evaluate the performance of the proposed method compared with three other methods, including two methods based on separate planning and one integrated model. Findings - The superiority of the proposed method compared with all the other three methods is demonstrated. Thus, the values of both integrated planning and considering operation-dependent failures are testified. The advantage of the proposed method is highlighted in the cases of high capacity utilization, long maintenance durations and low maintenance costs. The performance of the two methods based on separate planning is sensitive to the system utilization, and when utilization is high, the one with an availability-sensitive objective function defined for the maintenance problem performs better. Originality/value - Few studies have been carried out to integrate decisions on production lot and maintenance. Their considerations are either incomplete or not realistic enough. A more comprehensive and realistic integrated model is proposed in this paper, along with an iterative solution algorithm for it. A potential way to improve the performance of the classic planning method with its simplicity preserved is also presented.
引用
收藏
页码:162 / 182
页数:21
相关论文
共 31 条
[1]   An integrated production and preventive maintenance planning model [J].
Aghezzaf, E. H. ;
Jamali, M. A. ;
Ait-Kadi, D. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 181 (02) :679-685
[2]   Integrated production planning and preventive maintenance in deteriorating production systems [J].
Aghezzaf, El-Houssaine ;
Najid, Najib M. .
INFORMATION SCIENCES, 2008, 178 (17) :3382-3392
[3]  
Argoneto P., 2008, Production planning in production networks: models for medium and short-term planning
[4]   Simultaneous scheduling of production and maintenance tasks in the job shop [J].
Ben Ali, M. ;
Sassi, M. ;
Gossa, M. ;
Harrath, Y. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (13) :3891-3918
[5]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[6]   Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling [J].
Berrichi, A. ;
Yalaoui, F. ;
Amodeo, L. ;
Mezghiche, M. .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (09) :1584-1596
[7]   MODELS OF AUTOMATIC TRANSFER LINES WITH INVENTORY BANKS - REVIEW AND COMPARISON [J].
BUZACOTT, JA ;
HANIFIN, LE .
AIIE TRANSACTIONS, 1978, 10 (02) :197-207
[8]   Minimizing job tardiness using integrated preventive maintenance planning and production scheduling [J].
Cassady, CR ;
Kutanoglu, E .
IIE TRANSACTIONS, 2003, 35 (06) :503-513
[9]   Production lot sizing with process deterioration and machine breakdown [J].
Chakraborty, Tulika ;
Giri, B. C. ;
Chaudhuri, K. S. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) :606-618
[10]   Integrating noncyclical preventive maintenance scheduling and production planning for a single machine [J].
Fitouhi, Mohamed-Chahir ;
Nourelfath, Mustapha .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (02) :344-351