Constructed wetland and photocatalytic ozonation for university sewage treatment

被引:50
|
作者
Horn, Tamara Bianca [1 ]
Zerwes, Felipi Vargas [1 ]
Kist, Lourdes Teresinha [1 ]
Machado, Enio Leandro [1 ]
机构
[1] Univ Santa Cruz Sul UNISC, Grad Program Environm Technol, BR-96815900 Santa Cruz Do Sul, RS, Brazil
关键词
Constructed wetlands; Photocatalytic ozonation; Detoxification; Domestic sewage; WASTE-WATER TREATMENT; HORIZONTAL SUBSURFACE FLOW; OXIDATION; TIO2-PHOTOCATALYSIS; REMOVAL; SYSTEM; IMPACT;
D O I
10.1016/j.ecoleng.2013.12.012
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
This study investigates the combination of constructed wetlands (CW) with photocatalytic ozonation (UVITi02103) for the treatment of university sewage. Both of the tested CWs configurations were vegetated with Hymenachne grumosa in three stages of subsurface flow sequence. The CWs were designed with the following characteristics: vegetated system built within a plastic greenhouse (CW-1) and vegetated system built outdoors (CW-2). The CWs were operated in continuous flow with hydraulic retention time (HRT) of 1.87 days (Phase I) and intermittently for a 7-day period (Phase II). The UV/TiO2/O-3 reactor was applied after CW-1 (Phase III) to improve the quality of treated wastewater for reuse. The results revealed that the CW-1 +UV/TiO2/O-3 reactor batch configuration reduced COD and BOD5 by an average of 62.1% and 88.7%, respectively. TKN, NH3-N and total P reductions averaged 27.6%, 27.1% and 63.4%, respectively. One of the disadvantages of the UV/TiO2/O-3 reactor was the saturation of the ramp after 4 h of operation. In terms of acute detoxification, the influent decreased from moderately toxic to slightly toxic in the phytoremediation process (Phase I). Chronic detoxification was ineffective at this phase and effluents remained highly toxic. In the UV/TiO2/O-3 reactor (Phases II and III), detoxification was inefficient, increasing the acute toxicity of the effluent and maintaining it extremely toxic on chronic toxicity tests. Disinfection efficacy is particularly attributed to UV/TiO2/O-3, greatly reducing the microbial load (CFU/100 mL) from 105 to below the determination limit. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:134 / 141
页数:8
相关论文
共 50 条
  • [41] Treatment of Craft Brewery Sewage with SS VF and FWS Constructed Wetland - Lab Scale Experiment
    Dqbrowski, Wojciech
    Karolinczak, Beata
    Malinowski, Pawel
    Magrel, Lech
    ROCZNIK OCHRONA SRODOWISKA, 2021, 23 : 290 - 300
  • [42] Pollutant Removal from Sewage in Tropical Climate by Constructed Wetland System: An Asset for Irrigation
    Usharani, Boopathy
    Vasudevan, Namasivayam
    INTERNATIONAL LETTERS OF NATURAL SCIENCES, 2021, 82 : 20 - 43
  • [43] Development of a horizontal subsurface flow modular constructed wetland for urban runoff treatment
    Choi, J. Y.
    Maniquiz, M. C.
    Geronimo, F. K.
    Lee, S. Y.
    Lee, B. S.
    Kim, L. H.
    WATER SCIENCE AND TECHNOLOGY, 2012, 66 (09) : 1950 - 1957
  • [44] The constructed wetland association UK database of constructed wetland systems
    Cooper, P.
    WATER SCIENCE AND TECHNOLOGY, 2007, 56 (03) : 1 - 6
  • [45] Constructed wetland (CW) for industrial waste water treatment
    Vrhovsek, D
    Kukanja, V
    Bulc, T
    WATER RESEARCH, 1996, 30 (10) : 2287 - 2292
  • [46] Nitrogen accumulation in a constructed wetland for dairy wastewater treatment
    Shamir, E
    Thompson, TL
    Karpiscak, MM
    Freitas, RJ
    Zauderer, J
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2001, 37 (02): : 315 - 325
  • [47] A review of incorporation of constructed wetland with other treatment processes
    Liu, Ranbin
    Zhao, Yaqian
    Doherty, Liam
    Hu, Yuansheng
    Hao, Xiaodi
    CHEMICAL ENGINEERING JOURNAL, 2015, 279 : 220 - 230
  • [48] Effect of the organic loading rate in the stillage treatment in a constructed wetland with Canna indica
    Lopez-Rivera, Adrian
    Lopez-Lopez, Alberto
    Vallejo-Rodriguez, Ramiro
    Leon-Becerril, Elizabeth
    ENVIRONMENTAL PROGRESS & SUSTAINABLE ENERGY, 2016, 35 (02) : 411 - 415
  • [49] Removal efficiency, kinetic, and behavior of antibiotics from sewage treatment plant effluent in a hybrid constructed wetland and a layered biological filter
    Dan, A.
    Chen, Chun-xing
    Zou, Meng-yao
    Deng, Yang-yang
    Zhang, Xiao-meng
    Du, Jian-jun
    Yang, Yang
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2021, 288
  • [50] WASTEWATER TREATMENT IN A PILOT-SCALE CONSTRUCTED WETLAND
    Akkoyunlu, Atilla
    Bayhan, Hurrem
    Akiner, Muhammed Ernur
    Erturk, Ferruh
    FRESENIUS ENVIRONMENTAL BULLETIN, 2015, 24 (12B): : 4589 - 4596