Adaptive selection of heuristics for improving exam timetables

被引:20
作者
Burke, Edmund K. [1 ]
Qu, Rong [2 ]
Soghier, Amr [2 ]
机构
[1] Univ Stirling, Dept Comp Sci & Math, Stirling FK9 4LA, Scotland
[2] Univ Nottingham, Sch Comp Sci, Nottingham NG8 1BB, England
基金
英国工程与自然科学研究理事会;
关键词
HYBRIDIZATION;
D O I
10.1007/s10479-012-1140-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a hyper-heuristic approach which hybridises low-level heuristic moves to improve timetables. Exams which cause a soft-constraint violation in the timetable are ordered and rescheduled to produce a better timetable. It is observed that both the order in which exams are rescheduled and the heuristic moves used to reschedule the exams and improve the timetable affect the quality of the solution produced. After testing different combinations in a hybrid hyper-heuristic approach, the Kempe chain move heuristic and time-slot swapping heuristic proved to be the best heuristic moves to use in a hybridisation. Similarly, it was shown that ordering the exams using Saturation Degree and breaking any ties using Largest Weighted Degree produce the best results. Based on these observations, a methodology is developed to adaptively hybridise the Kempe chain move and timeslot swapping heuristics in two stages. In the first stage, random heuristic sequences are generated and automatically analysed. The heuristics repeated in the best sequences are fixed while the rest are kept empty. In the second stage, sequences are generated by randomly assigning heuristics to the empty positions in an attempt to find the best heuristic sequence. Finally, the generated sequences are applied to the problem. The approach is tested on the Toronto benchmark and the exam timetabling track of the second International Timetabling Competition, to evaluate its generality. The hyper-heuristic with low-level improvement heuristics approach was found to generalise well over the two different datasets and performed comparably to the state of the art approaches.
引用
收藏
页码:129 / 145
页数:17
相关论文
共 27 条
[1]  
Abdullah S, 2009, LECT NOTES COMPUT SC, V5818, P60, DOI 10.1007/978-3-642-04918-7_5
[2]  
Asmuni H, 2005, LECT NOTES COMPUT SC, V3616, P334, DOI 10.1007/11593577_19
[3]   An investigation of fuzzy multiple heuristic orderings in the construction of university examination timetables [J].
Asmuni, Hishammudin ;
Burke, Edmund K. ;
Garibaldi, Jonathan M. ;
McCollum, Barry ;
Parkes, Andrew J. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) :981-1001
[4]  
Atsuta M., 2008, P PRACT THEOR AUT TI, P19
[5]  
Bilgin B, 2007, LECT NOTES COMPUT SC, V3867, P394
[6]  
Burke E, 2003, INT SER OPER RES MAN, V57, P457, DOI 10.1007/0-306-48056-5_16
[7]  
Burke EK, 2011, STUD COMPUT INTELL, V387, P205
[8]   Hybrid variable neighbourhood approaches to university exam timetabling [J].
Burke, E. K. ;
Eckersley, A. J. ;
McCollum, B. ;
Petrovic, S. ;
Qu, R. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 206 (01) :46-53
[9]  
Burke E. K, 2008, PRACTICE THEORY AUTO
[10]   A graph-based hyper-heuristic for educational timetabling problems [J].
Burke, Edmund K. ;
McCollum, Barry ;
Meisels, Amnon ;
Petrovic, Sanja ;
Qu, Rong .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (01) :177-192