Determining numbers of workstations and operators for a linear walking-worker assembly line

被引:31
作者
Wang, Q. [1 ]
Owen, G. W. [1 ]
Mileham, A. R. [1 ]
机构
[1] Univ Bath, Dept Mech Engn, Bath BA2 7AY, Avon, England
基金
英国工程与自然科学研究理事会;
关键词
walking workers; assembly lines; simulation; flexible assembly; modelling;
D O I
10.1080/09511920600667358
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper presents an investigation into a system of linear walking-worker (WW) assembly lines that have been implemented in a local small and medium enterprise (SME). The work aims to observe the relevant impact on logical interactions and interrelationships between the number of workstations and the number of walking workers against the system performance and to minimize these numbers providing a quick response in re-configuration of the system to meet a given output and cycle time. This has been achieved by developing a simulation model for a theoretical study into the linear WW system using a manufacturing-focused simulation tool. By examination of the results of a series of simulation experiments, a minimization of the numbers of workstations and walking workers for a linear WW line configuration can be quantified. The research concluded that this multiskilled linear WW assembly line is able to sustain a higher flexibility and efficiency as compared with a conventional linear fixed-worker (FW) assembly line under similar conditions.
引用
收藏
页码:1 / 10
页数:10
相关论文
共 17 条
[1]  
[Anonymous], 1985, WIRE J INT, V18, P20
[2]   Performance of bucket brigades when work is stochastic [J].
Bartholdi, JJ ;
Eisenstein, DD ;
Foley, RD .
OPERATIONS RESEARCH, 2001, 49 (05) :710-719
[3]   Dynamics of two- and three-worker "bucket brigade" production lines [J].
Bartholdi, JJ ;
Bunimovich, LA ;
Eisenstein, DD .
OPERATIONS RESEARCH, 1999, 47 (03) :488-491
[4]  
Bischak DP, 1996, IIE TRANS, V28, P723
[5]   SIMULATION OF AN APPAREL ASSEMBLY CELL WITH WALKING WORKERS AND DECOUPLERS [J].
BLACK, JT ;
SCHROER, BJ .
JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (02) :170-180
[6]   A survey of the self-balancing production lines ("bucket brigades") [J].
Bratcu, AI ;
Dolgui, A .
JOURNAL OF INTELLIGENT MANUFACTURING, 2005, 16 (02) :139-158
[7]   Human factor policy testing in the sequencing of manual mixed model assembly lines [J].
Celano, G ;
Costa, A ;
Fichera, S ;
Perrone, G .
COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (01) :39-59
[8]  
Ghinato P, 1998, FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING, 1998, P703
[9]  
GROOVER MP, 2002, FUNDAMENTALS MODERN, P860
[10]   Benefits of skill chaining in serial production lines with cross-trained workers [J].
Hopp, WJ ;
Tekin, E ;
Van Oyen, MP .
MANAGEMENT SCIENCE, 2004, 50 (01) :83-98