Multi-commodity supply network planning in the forest supply chain

被引:24
作者
Chauhan, Satyaveer S. [2 ]
Frayret, Jean-Marc [1 ]
LeBel, Luc [3 ]
机构
[1] Ecole Polytech Montreal, Quebec City, PQ G1K 7P4, Canada
[2] Concordia Univ, Quebec City, PQ, Canada
[3] Univ Laval, Fac Foresterie & Geomat, Quebec City, PQ, Canada
关键词
Supply planning; Integer programming; Dynamic programming; Branch-and-price; Cut-to-length timber procurement; CUTTING STOCK PROBLEM; OPTIMIZATION; INDUSTRY; MODELS;
D O I
10.1016/j.ejor.2008.03.024
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider in this paper a two echelon timber procurement system in which the first echelon consists of multiple harvesting blocks and the second echelon consists of multiple mills (e.g., sawmills), both distributed geographically. Demand is put forward by mills in the form of volumes of logs of specific length and species. Due to the impact of log handling and sorting on cut-to-length harvester and forwarder productivity [Gingras, J.-F., Favreau, J., 2002. Incidence du triage sur la productivite des systemes par bois trononnes. Avantage 3], the harvesting cost per unit volume increases as the number of product variety harvested per block increases. The overall product allocation problem is a large scale mixed integer programming problem with the objective of minimizing combined harvesting and aggregated transportation costs, under demand satisfaction constraints. A heuristic is first introduced then, an algorithm based on the branch-and-price approach is proposed for larger scale problems. Experimentations compare solutions found with the heuristic with the corresponding optimal solutions obtained with both Cplex (using the branch-and-bound approach) and the branch-and-price approach. Results demonstrate the good performance level of the heuristic approach for small scale problems, and of the branch-and-price approach for large scale problems. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:688 / 696
页数:9
相关论文
共 29 条
[1]   FACILITY LOCATION MODELS FOR DISTRIBUTION PLANNING [J].
AIKENS, CH .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1985, 22 (03) :263-279
[2]  
[Anonymous], OPERATIONS RES APPL
[3]   The cutting stock problem with mixed objectives: Two heuristics based on dynamic programming [J].
Antonio, J ;
Chauvet, F ;
Chu, CB ;
Proth, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (02) :395-402
[4]  
ARCE EJ, 2002, FOREST SCI, V48
[5]  
Barnhart C., 1998, OPERATIONS RES, V46
[6]   Tactical supply chain planning in the forest products industry through optimization and scenario-based analysis [J].
Beaudoin, Daniel ;
LeBel, Luc ;
Frayret, Jean-Marc .
CANADIAN JOURNAL OF FOREST RESEARCH, 2007, 37 (01) :128-140
[7]  
BOYCHUK D, 1996, FOREST SCI, V42
[8]   Supply chain optimization in the pulp mill industry -: IP models, column generation and novel constraint branches [J].
Bredström, D ;
Lundgren, JT ;
Rönnqvist, M ;
Carlsson, D ;
Mason, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (01) :2-22
[9]  
BRUNBERG T, 2001, RESULTAT, V3
[10]  
CHAUHAN S, 2002, P SCM C POL