AGC simulator for price-based operation .2. Case study results

被引:62
|
作者
Kumar, J
Ng, KH
Sheble, G
机构
[1] Department of Electrical and Computer Engineering, Iowa State University, Ames
关键词
brokerage system; automatic generation control; load following; price-based operation;
D O I
10.1109/59.589596
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This is part II of a two paper set dealing with automatic generation control (AGC) problem in a deregulated industry. Through the passage of new public utility regulatory policies, the Federal Energy Regulatory Commission (FERC) encourages an open market system for price based operation. Recently, the FERC has issued a notice of proposed rulemaking [1] seeking comments on various ancillary services. One of these ancillary services is load following. The companion paper (Part I) [2] describes the simulation models and software implementation of load following contracts in the new environment. The part I also developed a framework for new market structure to understand AGC implementation in the price-based operation. This paper reviews the case studies to show the modifications required of conventional AGC software for the new environment. Three sets of case study results are reported. The first and second case studies illustrate how to simulate bilateral and poolco based transactions respectively in the new market place. The third case study considers various (bilateral and poolco based) contracts existing simultaneously in the system. The simulation results illustrate that the tie-line flows due to increased number of various contracts will tend to cancel among each other.
引用
收藏
页码:533 / 538
页数:6
相关论文
共 50 条
  • [21] Effect of operation parameters on thermal loading of wet brake discs: Part 2. Study results
    Sergienko, V. P.
    Tseluev, M. Yu
    JOURNAL OF FRICTION AND WEAR, 2012, 33 (06) : 472 - 478
  • [22] Effect of operation parameters on thermal loading of wet brake discs: Part 2. Study results
    V. P. Sergienko
    M. Yu. Tseluev
    Journal of Friction and Wear, 2012, 33 : 472 - 478
  • [23] SYSTEMATIZATION OF OTOSPONGIOSIS PARAMETERS (CONSULTATION, OPERATION AND RESULTS) FOR COMPUTER .2.
    CAUSSE, J
    BEL, J
    MICHAUX, P
    TAPON, J
    CEZARD, R
    CANUT, Y
    DESIRE, M
    ANNALES D OTO-LARYNGOLOGIE ET DE CHIRURGIE CERVICO-FACIALE, 1974, 91 (03): : 133 - 156
  • [24] HOW TO ANALYZE THE RESULTS OF LINEAR-PROGRAMS .2. PRICE INTERPRETATION
    GREENBERG, HJ
    INTERFACES, 1993, 23 (05) : 97 - 114
  • [25] Analysis of Microgrid Contributing to Hour-ahead market operation through Marginal Day-ahead market Price-Based Demand Response
    Ma Tianhu
    Jumpei, Baba
    Yumiko, Iwafune
    2017 2ND INTERNATIONAL CONFERENCE ON ADVANCES ON CLEAN ENERGY RESEARCH (ICACER 2017), 2017, 118 : 119 - 127
  • [26] Probabilistic assessment of ground-water contamination .2. Results of case study
    Istok, JD
    Rautman, CA
    GROUND WATER, 1996, 34 (06) : 1050 - 1064
  • [27] Fundamental aspects concerning Wind Power System Operation. Part 2. Case Study
    Babescu, M.
    Borlea, I.
    Jigoria-Oprea, D.
    2012 16TH IEEE MEDITERRANEAN ELECTROTECHNICAL CONFERENCE (MELECON), 2012, : 421 - 424
  • [28] CASE STUDY .2. LETTER
    READY, RK
    JOURNAL OF APPLIED BEHAVIORAL SCIENCE, 1968, 4 (02): : 232 - &
  • [29] RESULTS OF GERMAN NUCLEAR-POWER PLANT OPERATION 1976 .2.
    不详
    ATOMWIRTSCHAFT-ATOMTECHNIK, 1977, 22 (11): : 585 - 590
  • [30] Secondary reserves determination based on CPS1 and CPS2 compliant AGC operation
    Avila, Tomas
    Chavez, Hector
    2016 IEEE INTERNATIONAL CONFERENCE ON AUTOMATICA (ICA-ACCA), 2016,