A Fuzzy-AHP Methodology for Planning the Risk Management of Natural Hazards in Surface Mining Projects

被引:25
作者
Spanidis, Philip-Mark [1 ]
Roumpos, Christos [2 ]
Pavloudakis, Francis [2 ]
机构
[1] ASPROFOS Engn, Div Project Management, Athens 17675, Greece
[2] Public Power Corp Greece, Min Engn Dept, Athens 10432, Greece
关键词
fuzzy analytical hierarchy process; hazards; surface mines; risk management; MCDM METHODS; MODEL; PROMETHEE; TOPSIS; SWOT;
D O I
10.3390/su13042369
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Surface mining projects are vulnerable to natural hazards (earthquakes, floods, soil instabilities, and epidemic crises) which constitute the primary source of risks which affect the mining operations. In the framework of sustainable planning and development of such projects, the investigation of risk impacts is essential for taking the appropriate preventive measures before disastrous events appear in a mine. This paper proposes a methodology for the risk assessment of natural hazards in surface mining projects using the triangular Fuzzy Analytical Hierarchy Process (FAHP) for the determination of the probability of risk occurrence, combined with the Expected Value (EV) function, the Monte Carlo simulation, and the Program Evaluation Review Technique PERT method for making predictions of cost and time overruns. A case study of a hazardous event with impacts in the operations of a surface mine demonstrates the methodology as a flexible and low-cost tool for mining executives. This tool is useful in the planning stage of pre-disaster management projects in the mineral industry, considering mine sustainability views. The research work also investigates critical technical and economic aspects.
引用
收藏
页码:1 / 23
页数:23
相关论文
共 83 条
  • [21] The implementation factors that influence the ERP (enterprise resource planning) benefits
    Chou, Shih-Wei
    Chang, Yu-Chieh
    [J]. DECISION SUPPORT SYSTEMS, 2008, 46 (01) : 149 - 157
  • [22] Chuman T., 2015, Journal of Landscape Ecology, V8, P29, DOI DOI 10.1515/JLECOL-2015-0007
  • [23] Dey B., 2006, Natural hazards and disaster management
  • [24] Dey P.K., 2002, Cost Engineering, V44, P13
  • [25] Project risk management using multiple criteria decision-making technique and decision tree analysis: a case study of Indian oil refinery
    Dey, Prasanta Kumar
    [J]. PRODUCTION PLANNING & CONTROL, 2012, 23 (12) : 903 - 921
  • [26] Occupational health hazards in mining: an overview
    Donoghue, AM
    [J]. OCCUPATIONAL MEDICINE-OXFORD, 2004, 54 (05): : 283 - 289
  • [27] Quantitative hazard assessment system (Has-Q) for open pit mine slopes
    dos Santos, Tatiana Barreto
    Lana, Milene Sabino
    Pereira, Tiago Martins
    Canbulat, Ismet
    [J]. INTERNATIONAL JOURNAL OF MINING SCIENCE AND TECHNOLOGY, 2019, 29 (03) : 419 - 427
  • [28] Esmaeili A, 2014, TRANSFORM BUS ECON, V13, P602
  • [29] FEMA HAZUS-MH, 2004, FEMAS METH EST POT L
  • [30] Qualitative evolving rockfall hazard assessment for highwalls
    Ferrari, F.
    Giacomini, A.
    Thoeni, K.
    Lambert, C.
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2017, 98 : 88 - 101