Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan

被引:4
|
作者
Toktas, B
Azizoglu, M
Köksalan, SK
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Univ Washington, Dept Ind Engn, Seattle, WA 98195 USA
关键词
flow shop; makespan; maximum earliness; efficient solutions;
D O I
10.1016/s0377-2217(03)00192-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study we address the problem of minimizing makespan and maximum earliness simultaneously in a two-machine flow shop environment. We develop a branch-and-bound procedure that generates all efficient solutions with respect to two criteria. We propose several lower and upper bounding schemes to enhance the efficiency of the algorithm. We also propose a heuristic procedure that generates approximate efficient solutions. Our computational results reveal that the branch-and-bound procedure is capable of solving problems with up to 25 jobs and the heuristic procedure produces approximate efficient solutions that are very close to exact efficient solutions in very small computation times. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:286 / 295
页数:10
相关论文
共 50 条
  • [41] New results on two-machine flow-shop scheduling with rejection
    Zhang, Liqi
    Lu, Lingfa
    Li, Shisheng
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2016, 31 (04) : 1493 - 1504
  • [42] Relocation Scheduling in a Two-Machine Flow Shop with Resource Recycling Operations
    Lo, Ting-Chun
    Lin, Bertrand M. T.
    MATHEMATICS, 2021, 9 (13)
  • [43] Two-machine flow shop scheduling with linear decreasing job deterioration
    Wang, Ji-Bo
    Liu, Li-Li
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 56 (04) : 1487 - 1493
  • [44] Two-machine flow shop and open shop scheduling problems with a single maintenance window
    Mosheiov, Gur
    Sarig, Assaf
    Strusevich, Vitaly A.
    Mosheiff, Jonathan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 271 (02) : 388 - 400
  • [45] Mixed Integer Programming Formulations for Two-Machine Flow Shop Scheduling with an Availability Constraint
    Xu, Zhijun
    Xu, Dehua
    He, Jie
    Wang, Qi
    Liu, Aihua
    Xiao, Junfang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2018, 43 (02) : 777 - 788
  • [46] On the optimality conditions of the two-machine flow shop problem
    Hadda, Hatem
    Dridi, Najoua
    Hajji, Mohamed Karim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 426 - 435
  • [47] Mixed Integer Programming Formulations for Two-Machine Flow Shop Scheduling with an Availability Constraint
    Zhijun Xu
    Dehua Xu
    Jie He
    Qi Wang
    Aihua Liu
    Junfang Xiao
    Arabian Journal for Science and Engineering, 2018, 43 : 777 - 788
  • [48] Permutation schedules for a two-machine flow shop with storage
    Fung, Joey
    Zinder, Yakov
    OPERATIONS RESEARCH LETTERS, 2016, 44 (02) : 153 - 157
  • [49] Makespan minimization in the two-machine flowshop batch scheduling problem
    Cheng, TCE
    Lin, BMT
    Toker, A
    NAVAL RESEARCH LOGISTICS, 2000, 47 (02) : 128 - 144
  • [50] A two-machine flow-shop scheduling with a deteriorating maintenance activity on the second machine
    Gara-Ali, Ahmed
    Espinouse, Marie-Laure
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 481 - 488