Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan

被引:4
|
作者
Toktas, B
Azizoglu, M
Köksalan, SK
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Univ Washington, Dept Ind Engn, Seattle, WA 98195 USA
关键词
flow shop; makespan; maximum earliness; efficient solutions;
D O I
10.1016/s0377-2217(03)00192-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study we address the problem of minimizing makespan and maximum earliness simultaneously in a two-machine flow shop environment. We develop a branch-and-bound procedure that generates all efficient solutions with respect to two criteria. We propose several lower and upper bounding schemes to enhance the efficiency of the algorithm. We also propose a heuristic procedure that generates approximate efficient solutions. Our computational results reveal that the branch-and-bound procedure is capable of solving problems with up to 25 jobs and the heuristic procedure produces approximate efficient solutions that are very close to exact efficient solutions in very small computation times. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:286 / 295
页数:10
相关论文
共 50 条
  • [31] Two-machine flow shop scheduling with deteriorating jobs and chain precedence constraints
    Zhao, Chuanli
    Tang, Hengyong
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 136 (01) : 131 - 136
  • [32] Coordinating scheduling and rejection decisions in a two-machine flow shop scheduling problem
    Shabtay, Dvir
    Gerstl, Enrique
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 316 (03) : 887 - 898
  • [33] Minimizing the makespan in the two-machine no-wait flow-shop with limited machine availability
    Espinouse, ML
    Formanowicz, P
    Penz, B
    COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 37 (1-2) : 497 - 500
  • [34] Stochastic scheduling for a two-machine open shop
    Righter, R
    JOURNAL OF APPLIED PROBABILITY, 1997, 34 (03) : 733 - 744
  • [35] Two-Machine Job-Shop Scheduling Problem to Minimize the Makespan with Uncertain Job Durations
    Sotskov, Yuri N.
    Matsveichuk, Natalja M.
    Hatsura, Vadzim D.
    ALGORITHMS, 2020, 13 (01)
  • [36] Two-machine flow shop scheduling problems with minimal and maximal delays
    Bouquard J.-L.
    Lenté C.
    4OR, 2006, 4 (1) : 15 - 28
  • [37] Two-machine flow shop scheduling problems with no-wait jobs
    Bouquard, JL
    Billaut, JC
    Kubzin, MA
    Strusevich, VA
    OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 255 - 262
  • [38] New results on two-machine flow-shop scheduling with rejection
    Liqi Zhang
    Lingfa Lu
    Shisheng Li
    Journal of Combinatorial Optimization, 2016, 31 : 1493 - 1504
  • [39] Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
    Shanthi Muthuswamy
    Mario C. Vélez-Gallego
    Jairo Maya
    Miguel Rojas-Santiago
    The International Journal of Advanced Manufacturing Technology, 2012, 63 : 281 - 290
  • [40] Minimizing makespan in a two-machine no-wait flow shop with batch processing machines
    Muthuswamy, Shanthi
    Velez-Gallego, Mario C.
    Maya, Jairo
    Rojas-Santiago, Miguel
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 63 (1-4): : 281 - 290