Two-machine flow shop scheduling with two criteria:: Maximum earliness and makespan

被引:4
|
作者
Toktas, B
Azizoglu, M
Köksalan, SK
机构
[1] Middle E Tech Univ, Dept Ind Engn, TR-06531 Ankara, Turkey
[2] Univ Washington, Dept Ind Engn, Seattle, WA 98195 USA
关键词
flow shop; makespan; maximum earliness; efficient solutions;
D O I
10.1016/s0377-2217(03)00192-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study we address the problem of minimizing makespan and maximum earliness simultaneously in a two-machine flow shop environment. We develop a branch-and-bound procedure that generates all efficient solutions with respect to two criteria. We propose several lower and upper bounding schemes to enhance the efficiency of the algorithm. We also propose a heuristic procedure that generates approximate efficient solutions. Our computational results reveal that the branch-and-bound procedure is capable of solving problems with up to 25 jobs and the heuristic procedure produces approximate efficient solutions that are very close to exact efficient solutions in very small computation times. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:286 / 295
页数:10
相关论文
共 50 条
  • [21] Two-machine no-wait flow shop scheduling with missing operations
    Glass, CA
    Gupta, JND
    Potts, CN
    MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) : 911 - 924
  • [22] A distributionally robust approach for the two-machine permutation flow shop scheduling
    Lu, Haimin
    Pei, Zhi
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 709 - 739
  • [23] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME
    Hermes, Fatma
    Carlier, Jacques
    Moukrim, Aziz
    Ghedira, Khaled
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
  • [24] Outsourcing and scheduling for a two-machine flow shop with release times
    Ahmadizar, Fardin
    Amiri, Zeinab
    ENGINEERING OPTIMIZATION, 2018, 50 (03) : 483 - 498
  • [25] On two-machine Flow Shop Scheduling Problem with disjoint setups
    Gnatowski, Andrzej
    Rudy, Jaroslaw
    Idzikowski, Radoslaw
    2020 IEEE 15TH INTERNATIONAL CONFERENCE OF SYSTEM OF SYSTEMS ENGINEERING (SOSE 2020), 2020, : 277 - 282
  • [26] Two-machine flow shop scheduling of polyurethane foam production
    Lin, Bertrand M. T.
    Lin, Y-Y
    Fang, K-T
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 286 - 294
  • [27] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [28] A Genetic Algorithm to Minimize the Makespan in a Two-Machine Cross-Docking Flow Shop Problem
    Imen Hamdi
    Mohamed Fadhel Tekaya
    Journal of the Operations Research Society of China, 2020, 8 : 457 - 476
  • [29] Two-machine flow shop scheduling with deteriorating jobs: minimizing the weighted sum of makespan and total completion time
    Cheng, Mingbao
    Tadikamalla, Pandu R.
    Shang, Jennifer
    Zhang, Bixi
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (05) : 709 - 719
  • [30] A Genetic Algorithm to Minimize the Makespan in a Two-Machine Cross-Docking Flow Shop Problem
    Hamdi, Imen
    Tekaya, Mohamed Fadhel
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2020, 8 (03) : 457 - 476