An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

被引:41
作者
Badalpur, Mohammadreza [1 ]
Nurbakhsh, Ehsan [2 ]
机构
[1] Azad Univ, Tehran South Branch, Tehran, Iran
[2] Azad Univ, Tehran North Branch, Tehran, Iran
关键词
Risk assessment; risk qualitative analysis; road construction project; WASPAS method; FUZZY AHP; MANAGEMENT; SELECTION; PRICE; MODEL;
D O I
10.1080/15623599.2019.1595354
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Today, the focus on risks and uncertain events is one of the essential goals of any organization. If hazards are not taken into consideration at the planning stage it could be dangerous during project life cycle. Therefore, risk assessment is so important which has been extensively investigated by many researchers in recent years. This research suggested a method based on a combination of two WSM models (weighted sum model) and WPM (weighted product model), known as the weighted aggregated sum product assessment (WASPAS) method which was employed to assess negative effects of risks on project. This method has capability and more accuracy compared to independent methods in alternatives ranking. The WASPAS method is one of the new multi-index decision-making techniques which has been adopted and employed in many areas. In this research, we identified and evaluated the risks of a road construction project in Iran which the results showed inaccessibility/inappropriate of barrow pits, loss of key manpower during project life cycle, employing inexperienced subcontractors are of the most important risks among identified risks. Also this paper suggested the WASPAS method as a suitable method with more accuracy among MCDM techniques for evaluating of risks in a real situation.
引用
收藏
页码:910 / 918
页数:9
相关论文
共 35 条
[1]  
[Anonymous], 1974, 2 BATT I
[2]  
[Anonymous], 2013, PROJ MAN BOD KNOWL 2
[3]  
Badalpur M, 2015, J IND SYST ENG, V8, P1
[4]   Multi-Criteria Selection of a Deep-Water Port in Klaipeda [J].
Bagocius, Vygantas ;
Zavadskas, Edmundas Kazimieras ;
Turskis, Zenonas .
MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2013, 57 :144-148
[5]   Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction [J].
Chan, Joseph ;
Chan, Daniel ;
Chan, Albert ;
Lam, Patrick ;
Yeung, John .
JOURNAL OF FACILITIES MANAGEMENT, 2011, 9 (01) :34-+
[6]   An evaluation of risk factors impacting construction projects in Ghana [J].
Chileshe, Nicholas ;
Yirenkyi-Fianko, Adwoa Boadua .
JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2012, 10 (03) :306-329
[7]  
Chileshe N, 2010, PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, P336
[8]  
Costa K., 2009, CONTRACT MANAG UNPUB
[9]   A Single DEA-based Indicator for Assessing the Multiple Negative Effects of Project Risks [J].
Dai, Qianzhi ;
Li, Jianping .
PROMOTING BUSINESS ANALYTICS AND QUANTITATIVE MANAGEMENT OF TECHNOLOGY: 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT (ITQM 2016), 2016, 91 :769-773
[10]  
Dorfeshan Y, 2018, DETERMINING PROJECT