Optimization of Cable Force Adjustment in Cable-Stayed Bridge considering the Number of Stay Cable Adjustment

被引:10
|
作者
Zhang, Han-Hao [1 ]
Sun, Nan-Nan [1 ]
Wang, Pei-Zhi [1 ]
Liu, Man-Hui [2 ]
Li, Yuan [1 ]
机构
[1] Changan Univ, Sch Highway, Xian 710064, Peoples R China
[2] Zhejiang Sci Res Inst Transport, Hangzhou 310000, Peoples R China
关键词
D O I
10.1155/2020/4527309
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Modern cable-stayed bridges are spatial, multicable systems. The cable force needs to be adjusted during the construction phase and maintenance phase. The existing calculation methods of cable force adjustment mainly considered the rationality of structural force, but only few research studies have been conducted on how to reduce the number of stay cables which need to be adjusted. This study aims to propose an optimization calculation method including the optimization module with the sensitivity analysis and updating design variable module (UDVM), which are used for cable force adjustment in cable-stayed bridges. Based on the finite difference method, the sensitivity analysis is adopted in the optimization module, which can capture the response of structures as design variables vary; the particle swarm optimization method is adopted for structural optimization. The proposed method can dramatically reduce the number of stay cables which need to be adjusted and ensure the main girder stresses remain in a reasonable state during stay cable adjustment progress by UDVM. Moreover, the proposed method can continuously update the objective function, constraint conditions, and design variables. Finally, this proposed optimization calculation method is applied to two different cable-stayed bridges to validate the reliability and feasibility of the method.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Optimization on Stay Cable's Initial Tension Force for Extradosed Cable-Stayed Bridge
    Lin, Peng-Zhen
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION ICMS2010, VOL 3: MODELLING AND SIMULATION IN INDUSTRIAL APPLICATION, 2010, : 302 - 305
  • [2] Review on Cable Force Optimization Method for Cable-stayed Bridge in Completed Bridge State
    Dai J.
    Qin F.-J.
    Di J.
    Chen Y.-R.
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2019, 32 (05): : 17 - 37
  • [3] Cable Force Adjustment for Long-Span Cable-Stayed Bridge Based on Multilayer Perceptron Deep Learning
    Shan, De-Shan
    Zhang, Xiao
    Gu, Xiao-Yu
    Li, Qiao
    Bridge Construction, 2021, 51 (01) : 14 - 20
  • [5] Cable Force Adjustment for Segmental Assembled Concrete Cable_Stayed Bridge Considering the Effect of Beam Weight Errors
    Fu C.
    Lao Y.
    Xie Z.
    Lin L.
    Yan P.
    Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (02): : 66 - 72
  • [6] Cable Tension Measurement for Cable-stayed Bridge Considering on the Effect of Damper
    Li, Fengchen
    Wang, Dapeng
    Yang, Ou
    Zhang, Lina
    Yang, Zeping
    2009 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, VOLS 1-7, CONFERENCE PROCEEDINGS, 2009, : 2586 - +
  • [7] A Research to Cable Force Optimizing Calculation of Cable-stayed Arch Bridge
    Dai Yu-wen
    Wang You-yuan
    SECOND SREE CONFERENCE ON ENGINEERING MODELLING AND SIMULATION (CEMS 2012), 2012, 37 : 155 - 160
  • [8] Structural analysis of cable-stayed bridge under random cable force
    Wang, Li-Bin
    Li, Ai-Qun
    Jin, Hui
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2010, 23 (04): : 45 - 50
  • [9] Analysis of precision and error of cable force identification of cable-stayed bridge
    Li, Feng-Chen
    Tian, Shi-Zhu
    Ou, Jin-Ping
    Journal of Harbin Institute of Technology (New Series), 2011, 18 (02) : 91 - 95
  • [10] Effect of cable stiffness on a cable-stayed bridge
    Wang, YC
    STRUCTURAL ENGINEERING AND MECHANICS, 1999, 8 (01) : 27 - 38