An Analysis of Project Risks Using the Non-parametric Bootstrap Technique
被引:8
作者:
Alborzi, S.
论文数: 0引用数: 0
h-index: 0
机构:
Islamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, IranIslamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, Iran
Alborzi, S.
[1
]
Aminian, A.
论文数: 0引用数: 0
h-index: 0
机构:
Islamic Azad Univ, Dept Ind Engn, Gachsaran Branch, Damavand, IranIslamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, Iran
Aminian, A.
[2
]
Mojtahedi, S. M. H.
论文数: 0引用数: 0
h-index: 0
机构:
Islamic Azad Univ, Grad Sch, Dept Ind Engn, S Tehran Branch Member Young Res Club, Tehran, IranIslamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, Iran
Mojtahedi, S. M. H.
[3
]
Mousavi, S. M.
论文数: 0引用数: 0
h-index: 0
机构:
Islamic Azad Univ, Grad Sch, Dept Ind Engn, S Tehran Branch Member Young Res Club, Tehran, IranIslamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, Iran
Mousavi, S. M.
[3
]
机构:
[1] Islamic Azad Univ Qazvin, Dept Mech & Ind Engn, Qazvin, Iran
[2] Islamic Azad Univ, Dept Ind Engn, Gachsaran Branch, Damavand, Iran
[3] Islamic Azad Univ, Grad Sch, Dept Ind Engn, S Tehran Branch Member Young Res Club, Tehran, Iran
来源:
IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3
|
2008年
关键词:
Bootstrap;
non-parametric standard deviation;
project risk analysis;
risk factor;
D O I:
10.1109/IEEM.2008.4738079
中图分类号:
F [经济];
学科分类号:
02 ;
摘要:
Standard statistical techniques do not always provide answers to project risks questions because often there are no parametric distributions on which significance can be estimated. Resampling methods provide a battery of tests that can be used in such circumstances. In the past few years these methods have been explored theoretically and are now employed frequently. The aim of the paper is to highlight the motivations for using a model base on bootstrap in typical project risk analysis. Bootstrap method for decreasing the standard deviation of project risks is described. We give a numerical example for better understanding.
机构:
UCL, Dept Econ, London WC1E 6BT, England
Inst Fiscal Studies, Ctr Microdata Methods & Practice, London WC1E 7AE, England
Aarhus Univ, Ctr Res Econometr Anal Time Series, DK-8000 Aarhus C, DenmarkUCL, Dept Econ, London WC1E 6BT, England
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Wang, Wei
Smith, Jack
论文数: 0引用数: 0
h-index: 0
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Smith, Jack
Hejase, Hussein A.
论文数: 0引用数: 0
h-index: 0
机构:
Cold Spring Harbor Lab, Simons Ctr Quantitat Biol, POB 100, Cold Spring Harbor, NY 11724 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Hejase, Hussein A.
Liu, Kevin J.
论文数: 0引用数: 0
h-index: 0
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
机构:
UCL, Dept Econ, London WC1E 6BT, England
Inst Fiscal Studies, Ctr Microdata Methods & Practice, London WC1E 7AE, England
Aarhus Univ, Ctr Res Econometr Anal Time Series, DK-8000 Aarhus C, DenmarkUCL, Dept Econ, London WC1E 6BT, England
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Wang, Wei
Smith, Jack
论文数: 0引用数: 0
h-index: 0
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Smith, Jack
Hejase, Hussein A.
论文数: 0引用数: 0
h-index: 0
机构:
Cold Spring Harbor Lab, Simons Ctr Quantitat Biol, POB 100, Cold Spring Harbor, NY 11724 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA
Hejase, Hussein A.
Liu, Kevin J.
论文数: 0引用数: 0
h-index: 0
机构:
Michigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USAMichigan State Univ, Dept Comp Sci & Engn, E Lansing, MI 48824 USA