Prediction of Cost Overrun Risk in Construction Projects

被引:14
作者
Plebankiewicz, Edyta [1 ]
Wieczorek, Damian [1 ]
机构
[1] Cracow Univ Technol, Fac Civil Engn, Div Management Civil Engn, PL-31155 Krakow, Poland
关键词
cost overrun; construction project; fuzzy sets; fuzzy inference model of Mamdani; INFRASTRUCTURE PROJECTS; ESTIMATION MODEL; INDUSTRY;
D O I
10.3390/su12229341
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The paper proposes a cost overrun risks prediction model, the structure of which is based on the fuzzy inference model of Mamdani. The model consists of numerous inputs and one output (MISO, multi-input-single-output), based on processes running consecutively in three blocks (the fuzzy block, the interference block, and the block of sharpening the representative output value). The input variables of the model include the share of element costs in the building costs (SE), predicted changes in the number of works (WC), and expected changes in the unit price (PC). The developed rule base makes it possible to determine the risk of cost overruns in the following categories: "very low", "quite low", "average", "quite high", and "very high". Twenty-seven rules were assumed in the interference block. The operation of the model was illustrated by the example of selected elements of a road object and was validated by checking the correctness of the assumptions made at the design stage of the inference block rule base. It has been proven that with the increase of the share of element costs in the building costs (SE), predicted changes in the number of works (WC), and expected changes in the unit price (PC), the value of the risk exceeding the costs of a given element of the construction project (R) increases naturally and smoothly. It was emphasized in the conclusions that the cost overrun risks prediction model is intended for general contractors who subcontract many stages of works to their subcontractors in accordance with the agreed division into work elements.
引用
收藏
页码:1 / 15
页数:15
相关论文
共 43 条
  • [1] Abu Hammad AA, 2008, JORDAN J CIV ENG, V2, P250
  • [2] THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA
    Andric, Jelena M.
    Mahamadu, Abdul-Majeed
    Wang, Jiayuan
    Zou, Patrick X. W.
    Zhong, Ruoyu
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (03) : 203 - 214
  • [3] [Anonymous], 1992, Transportation Research Record 1351
  • [4] [Anonymous], 2016, MATER BUDOWLANE, DOI DOI 10.15199/33.2016.06.25
  • [5] [Anonymous], 2000, ARCHIT BUILT ENV J F
  • [6] Predicting cost deviation in reconstruction projects: Artificial neural network versus regression
    Attalla, M
    Hegazy, T
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04): : 405 - 411
  • [7] Azis AdeAsmi Abdul., 2013, RES J APPL SCI ENG T, V5, P2621
  • [8] Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases
    Cantarelli, C. C.
    Molin, E. J. E.
    van Wee, B.
    Flyvbjerg, B.
    [J]. TRANSPORT POLICY, 2012, 22 : 49 - 56
  • [9] Cantarelli CC, 2010, EUR J TRANSP INFRAST, V10, P5
  • [10] EXPLORING THE PROPERTIES OF COST OVERRUN RISK PROPAGATION NETWORK (CORPN) FOR PROMOTING COST MANAGEMENT
    Chen, Yun
    Hu, Zhigen
    Liu, Quan
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (01) : 1 - 18