Real time command control architecture for an ITER relevant inspection robot in operation on Tore Supra

被引:14
|
作者
Keller, Delphine [1 ]
Bayetti, P. [2 ]
Bonnemason, J. [1 ]
Bruno, V. [2 ]
Chambaud, P. [1 ]
Friconneau, J. P. [1 ]
Gargiulo, L. [2 ]
Itchah, M. [1 ]
Lamy, S. [1 ]
Le, R. [2 ]
Measson, Y. [1 ]
Perrot, Y. [1 ]
Ponsort, D. [1 ]
机构
[1] CEA, LIST Serv Robot Interact, F-92265 Fontenay Aux Roses, France
[2] CEA Cadarache, IRFM, DSM, EURATOM Assoc, F-13108 St Paul Les Durance, France
关键词
Remote Handling; ITER; Tore Supra; Articulated Inspection Arm (AIA); Robot; Maintenance; Command control;
D O I
10.1016/j.fusengdes.2008.11.044
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
In 2008, the Articulated Inspection Arm (AIA) performed its first deployment in Tore Supra tokamak vessel, under real vacuum and temperature conditions (10(-6) Pa and 120 degrees C) after a conditioning phase to avoid pollution of the chamber. This full demonstration is a turning point in the project, allowing a second phase to start toward the objective to make use of the Remote Handling Equipment as an inspection routine tool. This feasibility demonstration will also be performed on Tore Supra. At this stage, the system requires enhancements of overall technologies and also developments of the Remote Handling control system. Lessons learned in the first phase of the project and experience collected for more than 20 years by Robotics Units of CEA-LIST teams on teleoperated systems enable to identify three main fields to explore to reach the objectives: Development of a reliable control based on a real time generic command control system. Development of a graphical supervisor for intuitive steering. Development of a generic flexible model for realistic computations of the robot localization in the environment. This paper is dedicated to the description of the further developments that shall be done for routine Remote Handling operations. It presents the R&D project roadmap for the next years. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:1015 / 1019
页数:5
相关论文
共 28 条
  • [11] The ITER Fast Plant System Controller ATCA prototype Real-Time Software Architecture
    Carvalho, B. B.
    Santos, B.
    Carvalho, P. F.
    Neto, A.
    Boncagni, L.
    Batista, A. J. N.
    Correia, M.
    Sousa, J.
    Goncalves, B.
    FUSION ENGINEERING AND DESIGN, 2013, 88 (6-8) : 541 - 546
  • [12] A case study of the real-time framework for the implementation of the ITER plasma control system
    Lee, W.
    Tak, T.
    Zagar, A.
    Van Herck, W.
    Gunion, R.
    Ravensbergen, T.
    Zabeo, L.
    de Vries, P. C.
    Pospelov, G.
    FUSION ENGINEERING AND DESIGN, 2023, 193
  • [13] A pipelined reconfigurable architecture for real-time image processing of robot vision servoing
    Wang, Fuzhi
    Huang, Dagui
    Sheng, Ge
    2007 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, VOLS I-V, CONFERENCE PROCEEDINGS, 2007, : 2264 - 2269
  • [14] A real-time spiking cerebellum model for learning robot control
    Carrillo, Richard R.
    Ros, Eduardo
    Boucheny, Christian
    Coenen, Olivier J. -M. D.
    BIOSYSTEMS, 2008, 94 (1-2) : 18 - 27
  • [15] A PROXIMITY SENSOR AND ITS APPLICATION IN REAL-TIME ROBOT CONTROL
    LI, YF
    ROBOTICS AND AUTONOMOUS SYSTEMS, 1994, 13 (01) : 25 - 37
  • [16] System for real-time mobile robot control through visual telepresence
    Zalud, L.
    Annals of DAAAM for 2004 & Proceedings of the 15th International DAAAM Symposium: INTELLIGNET MANUFACTURING & AUTOMATION: GLOBALISATION - TECHNOLOGY - MEN - NATURE, 2004, : 495 - 496
  • [17] Robot Trajectory Tracking Control Based on Reference Trajectory Real-time Modification
    Xiao F.
    Li G.
    Zhang X.
    Tao B.
    Jiang G.
    Li G.
    Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2023, 54 (02): : 441 - 449
  • [18] Real-Time Performance of Hybrid Mobile Robot Control Utilizing USB Protocol
    Augustyn, Jacek
    INTERNATIONAL JOURNAL OF ADVANCED ROBOTIC SYSTEMS, 2015, 12
  • [19] REAL-TIME CONTROL OF ADVANCED SCENARIOS FOR STEADY-STATE TOKAMAK OPERATION
    Litaudon, X.
    FUSION SCIENCE AND TECHNOLOGY, 2011, 59 (03) : 469 - 485
  • [20] Real-Time Discrete Adaptive Control of Robot Arm Based on Digital Signal Processing
    龙绪明
    Journal of Southwest Jiaotong University(English Edition), 2008, (01) : 24 - 29