Convex contractive interval linear programming for resources and environmental systems management

被引:10
作者
Cheng, Guanhui [1 ]
Huang, Guohe [1 ,2 ]
Dong, Cong [2 ]
机构
[1] Univ Regina, Fac Engn & Appl Sci, Regina, SK S4S 0A2, Canada
[2] Univ Regina, Inst Energy Environm & Sustainabil Res, Regina, SK S4S 0A2, Canada
关键词
Resources and environmental systems management; Interval uncertainty; Interval linear programming; Constraint violation; AIR-QUALITY MANAGEMENT; WASTE-LOAD-ALLOCATION; WATER-RESOURCES; MODELING APPROACH; OPTIMIZATION MODEL; GENETIC-ALGORITHM; FUZZY; UNCERTAINTY; BASIN; COEFFICIENTS;
D O I
10.1007/s00477-015-1187-1
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
It is likely that the most reliable estimation of system uncertainty in resources and environmental systems management (RESM) is a value range with an unknown distribution. Stochastic programming would be challenged by distortion of the original uncertain information through fabricating an inexistent probabilistic distribution function. Instead, interval linear programming (ILP), i.e. a synthesis of interval-set coefficients and the conventional linear programming, has been employed to identify the desired schemes for a number of RESM problems under interval uncertainty. However, its effectiveness is disabled by constraint violation which may lead to severe penalties on socio-economic or eco-environmental development. To mitigate such a challenge, a convex contractive interval linear programming (CCILP) approach is proposed in this study. It mainly consists of six modules: parameterizing an RESM problem as an ILP model, initializing a hyperrectangle decision space by two linear programming sub-models, revealing causes of constraint violation given a criterion, inferring feasibilities of potential solutions, finalizing a feasible hyperrectangle decision space by another linear programming sub-model, and supporting RESM of various complexities through alternative variants. A simple ILP model for RESM is introduced to demonstrate the procedures of CCILP and verify its advantages over existing ILP methods. The result indicates that CCILP is capable of robustly incorporating interval uncertainties into the optimization process, avoiding heavy computation burdens on complicated sub-models, eliminating occurrence of constraint violation, enabling provision of a hyperrectangle decision space, adapting to diverse system requirements, and increasing reliability of decision support for interval linear RESM problems.
引用
收藏
页码:205 / 224
页数:20
相关论文
共 94 条
[1]  
[Anonymous], 1991, Handbook of Genetic Algorithms
[2]   AN EXPLICIT SOLUTION OF A SPECIAL CLASS OF LINEAR PROGRAMMING PROBLEMS [J].
BENISRAEL, A ;
CHARNES, A .
OPERATIONS RESEARCH, 1968, 16 (06) :1166-+
[3]   DECOMPOSITION METHOD FOR INTERVAL LINEAR PROGRAMMING [J].
BENISRAEL, A ;
ROBERS, PD .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (05) :374-387
[4]   Community-scale renewable energy systems planning under uncertainty-An interval chance-constrained programming approach [J].
Cai, Y. P. ;
Huang, G. H. ;
Yang, Z. F. ;
Lin, Q. G. ;
Tan, Q. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2009, 13 (04) :721-735
[5]   Multiobjective programming in optimization of interval objective functions - A generalized approach [J].
Chanas, S ;
Kuchta, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (03) :594-598
[6]   Water pollution control in river basin by interactive fuzzy interval multiobjective programming [J].
Chang, NB ;
Chen, HW ;
Shaw, DG ;
Yang, CH .
JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1997, 123 (12) :1208-1216
[7]   A fuzzy interval multiobjective mixed integer programming approach for the optimal planning of solid waste management systems [J].
Chang, NB ;
Chen, YL ;
Wang, SF .
FUZZY SETS AND SYSTEMS, 1997, 89 (01) :35-60
[8]   CHANCE-CONSTRAINED PROGRAMMING [J].
CHARNES, A ;
COOPER, WW .
MANAGEMENT SCIENCE, 1959, 6 (01) :73-79
[9]   An inexact robust optimization method for supporting carbon dioxide emissions management in regional electric-power systems [J].
Chen, C. ;
Li, Y. P. ;
Huang, G. H. .
ENERGY ECONOMICS, 2013, 40 :441-456
[10]   Planning of municipal solid waste management systems under dual uncertainties: a hybrid interval stochastic programming approach [J].
Cheng, G. H. ;
Huang, G. H. ;
Li, Y. P. ;
Cao, M. F. ;
Fan, Y. R. .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2009, 23 (06) :707-720