An economic assessment framework for decommissioning of offshore wind farms using a cost breakdown structure

被引:34
作者
Adedipe, Tosin [1 ]
Shafiee, Mahmood [2 ]
机构
[1] Cranfield Univ, Dept Energy & Power, Cranfield MK43 0AL, Beds, England
[2] Univ Kent, Sch Engn & Digital Arts, Canterbury CT2 7NT, Kent, England
关键词
Wind energy; Decommissioning; Offshore wind farm; Life-cycle costing; Cost breakdown structure (CBS); LIFE-CYCLE ASSESSMENT; INSTALLATION COSTS; TURBINES; ENERGY; EXTENSION;
D O I
10.1007/s11367-020-01793-x
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Purpose As wind power generation increases globally, there will be a substantial number of wind turbines that need to be decommissioned in the coming years. It is crucial for wind farm developers to design safe and cost-effective decommissioning plans and procedures for assets before they reach the end of their useful life. Adequate financial provisions for decommissioning operations are essential, not only for wind farm owners but also for national governments. Economic analysis approaches and cost estimation models therefore need to be accurate and computationally efficient. Thus, this paper aims to develop an economic assessment framework for decommissioning of offshore wind farms using a cost breakdown structure (CBS) approach. Methods In the development of the models, all the cost elements and their key influencing factors are identified from literature and expert interviews. Similar activities within the decommissioning process are aggregated to form four cost groups including: planning and regulatory approval, execution, logistics and waste management, and post-decommissioning. Some mathematical models are proposed to estimate the costs associated with decommissioning activities as well as to identify the most critical cost drivers in each activity group. The proposed models incorporate all cost parameters involved in each decommissioning phase for more robust cost assessment. Results and discussion A case study of a 500 MW baseline offshore wind farm is proposed to illustrate the models' applicability. The results show that the removal of wind turbines and foundation structures is the most costly and lengthy stage of the decommissioning process due to many requirements involved in carrying out the operations. Although inherent uncertainties are taken into account, cost estimates can be easily updated when new information becomes available. Additionally, further decommissioning cost elements can be captured allowing for sensitivity analysis to be easily performed. Conclusions Using the CBS approach, cost drivers can be clearly identified, revealing critical areas that require attention for each unique offshore wind decommissioning project. The CBS approach promotes adequate management and optimisation of identified key cost drivers, which will enable all stakeholders involved in offshore wind farm decommissioning projects to achieve cost reduction and optimal schedule, especially for safety-critical tasks.
引用
收藏
页码:344 / 370
页数:27
相关论文
共 56 条
  • [1] 1C Offshore, 2019, GLOB OFFSH WIND DAT
  • [2] Animah I, 2018, SAFETY AND RELIABILITY - SAFE SOCIETIES IN A CHANGING WORLD, P1767
  • [3] [Anonymous], 2020, Offshore wind in Europe: key trends and statistics 2019
  • [4] Bezbradica M, 2016, PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE MULTIDISCIPLINARY ENGINEERING DESIGN OPTIMIZATION (MEDO)
  • [5] Offshore wind power development in Europe and its comparison with onshore counterpart
    Bilgili, Mehmet
    Yasar, Abdulkadir
    Simsek, Erdogan
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (02) : 905 - 915
  • [6] Methodology to calculate the installation costs of offshore wind farms located in deep waters
    Castro-Santos, Laura
    Filgueira-Vizoso, Almudena
    Lamas-Galdo, Isabel
    Carral-Couce, Luis
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 170 : 1124 - 1135
  • [7] Decision variables for floating offshore wind farms based on life-cycle cost: The case study of Galicia (North-West of Spain)
    Castro-Santos, Laura
    [J]. OCEAN ENGINEERING, 2016, 127 : 114 - 123
  • [8] Producer responsibility: Defining the incentive for recycling composite wind turbine blades in Europe
    Cherrington, R.
    Goodship, V.
    Meredith, J.
    Wood, B. M.
    Coles, S. R.
    Vuillaume, A.
    Feito-Boirac, A.
    Spee, F.
    Kirwan, K.
    [J]. ENERGY POLICY, 2012, 47 : 13 - 21
  • [9] Life cycle assessment of wind turbines in Pinarbai-Kayseri
    Demir, Nesrin
    Taskin, Akif
    [J]. JOURNAL OF CLEANER PRODUCTION, 2013, 54 : 253 - 263
  • [10] Department for Business Energy and Industrial Strategy, 2019, OFFSH REN DEC GUID I