Pure cycles in flexible robotic cells

被引:22
作者
Gultekin, Hakan [1 ]
Karasan, Oya Ekin [1 ]
Akturk, M. Selim [1 ]
机构
[1] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
关键词
Flexible manufacturing systems; CNC; Industrial robots; Cellular automation; Optimization; Production control; SERVER;
D O I
10.1016/j.cor.2007.10.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this study, an m-machine flexible robotic manufacturing cell consisting of CNC machines is considered. The flexibility of the machines leads to a new class of robot move cycles called the pure cycles. We first model the problem of determining the best pure cycle in an m-machine cell as a special travelling salesman problem in which the distance matrix consists of decision variables as well as parameters. We focus on two specific cycles among the huge class of pure cycles. We prove that, in most of the regions, either one of these two cycles is optimal. For the remaining regions we derive worst case performances of these cycles. We also prove that the set of pure cycles dominates the flowshop-type robot move cycles considered in the literature. As a design problem, we consider the number of machines in a cell as a decision variable. We determine the optimal number of machines that minimizes the cycle time for given cell parameters such as the processing times, robot travel times and the loading/unloading times of the machines. (C) 2007 Elsevier Ltd. All rights reserved.
引用
收藏
页码:329 / 343
页数:15
相关论文
共 13 条
  • [1] Equal processing and equal setup time cases of scheduling parallel machines with a single server
    Abdekhodaee, AH
    Wirth, A
    Gan, HS
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (11) : 1867 - 1889
  • [2] Robotic cell scheduling with operational flexibility
    Akturk, MS
    Gultekin, H
    Karasan, OE
    [J]. DISCRETE APPLIED MATHEMATICS, 2005, 145 (03) : 334 - 348
  • [3] Cycles and permutations in robotic cells
    Brauner, N
    Finke, G
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2001, 34 (5-6) : 565 - 591
  • [4] Cyclic scheduling of identical parts in a robotic cell
    Crama, Y
    Van de Klundert, J
    [J]. OPERATIONS RESEARCH, 1997, 45 (06) : 952 - 965
  • [5] Crama Y., 1999, Journal of Scheduling, V2, P35, DOI 10.1002/(SICI)1099-1425(199901/02)2:1<35::AID-JOS15>3.0.CO
  • [6] 2-J
  • [7] Cyclic scheduling in robotic flowshops
    Crama, Y
    Kats, V
    van de Klundert, J
    Levner, E
    [J]. ANNALS OF OPERATIONS RESEARCH, 2000, 96 (1-4) : 97 - 124
  • [8] Sequencing and scheduling in robotic cells: Recent developments
    Dawande, M
    Geismar, HN
    Sethi, SP
    Sriskandarajah, C
    [J]. JOURNAL OF SCHEDULING, 2005, 8 (05) : 387 - 426
  • [9] A SYNTHESIS OF DECISION-MODELS FOR TOOL MANAGEMENT IN AUTOMATED MANUFACTURING
    GRAY, AE
    SEIDMANN, A
    STECKE, KE
    [J]. MANAGEMENT SCIENCE, 1993, 39 (05) : 549 - 567
  • [10] GULTEKIN H, 2007, INT J PRODU IN PRESS