共 51 条
- [42] Effects of the update frequency of production plans on the logistical performance of production planning and control [J]. 12TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING, 2019, 79 : 421 - 426
- [43] Multi-Stage assembly flow shop with setup time and release time [J]. OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
- [45] BENCHMARKS FOR BASIC SCHEDULING PROBLEMS [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) : 278 - 285
- [49] Waschneck B., 2017, CEUR WORKSHOP PROC