Exploring the benefits of scheduling with advanced and real-time information integration in Industry 4.0: A computational study

被引:29
作者
Fernandez-Viagas, Victor [1 ]
Framinan, Jose M. [1 ,2 ]
机构
[1] Univ Seville, Sch Engn, Ind Management, Camino Descubrimientos S-N, Seville 41092, Spain
[2] Univ Seville, Lab Engn Environm Sustainabil, Seville, Spain
关键词
Industry; 4.0; Smart factory; Information integration; Scheduling; Flow shop; ASSEMBLY FLOW-SHOP; PERMUTATION FLOWSHOP; TOTAL TARDINESS; RELEASE DATES; ALGORITHM; HEURISTICS; MINIMIZATION; PERFORMANCE; POLICIES; SYSTEMS;
D O I
10.1016/j.jii.2021.100281
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The technological advances recently brought to the manufacturing arena (collectively known as Industry 4.0) offer huge possibilities to improve decision-making processes in the shop floor by enabling the integration of information in real-time. Among these processes, scheduling is often cited as one of the main beneficiaries, given its data-intensive and dynamic nature. However, in view of the extremely high implementation costs of Industry 4.0, these potential benefits should be properly assessed, also taking into account that there are different approaches and solution procedures that can be employed in the scheduling decision-making process, as well as several information sources (i.e. not only shop floor status data, but also data from upstream/downstream processes). In this paper, we model various decision-making scenarios in a shop floor with different degrees of uncertainty and diverse efficiency measures, and carry out a computational experience to assess how real-time and advance information can be advantageously integrated in the Industry 4.0 context. The extensive computational experiments (equivalent to 6.3 years of CPU time) show that the benefits of using real-time, integrated shop floor data and advance information heavily depend on the proper choice of both the scheduling approach and the solution procedures, and that there are scenarios where this usage is even counterproductive. The results of the paper provide some starting points for future research regarding the design of approaches and solution procedures that allow fully exploiting the technological advances of Industry 4.0 for decision-making in scheduling.
引用
收藏
页数:11
相关论文
共 51 条
  • [41] Analysis of reactive scheduling problems in a job shop environment
    Sabuncuoglu, I
    Bayiz, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 126 (03) : 567 - 586
  • [42] Effects of the update frequency of production plans on the logistical performance of production planning and control
    Schuh, Guenther
    Prote, Jan-Philipp
    Luckert, Melanie
    Huennekes, Philipp
    Schmidhuber, Matthias
    [J]. 12TH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING, 2019, 79 : 421 - 426
  • [43] Multi-Stage assembly flow shop with setup time and release time
    Sheikh, Shaya
    Komaki, G. M.
    Kayvanfar, Vahid
    Teymourian, Ehsan
    [J]. OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [44] Multi objective two-stage assembly flow shop with release time
    Sheikh, Shaya
    Komaki, G. M.
    Kayvanfar, Vahid
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 124 : 276 - 292
  • [45] BENCHMARKS FOR BASIC SCHEDULING PROBLEMS
    TAILLARD, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 64 (02) : 278 - 285
  • [46] On the combined effect of due date setting, order release, and output control: an assessment by simulation
    Thuerer, Matthias
    Stevenson, Mark
    Land, Martin J.
    Fredendall, Larry D.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (06) : 1741 - 1755
  • [47] Minimising total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics
    Vallada, Eva
    Ruiz, Ruben
    Minella, Gerardo
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (04) : 1350 - 1373
  • [48] Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    Vieira, GE
    Herrmann, JW
    Lin, E
    [J]. JOURNAL OF SCHEDULING, 2003, 6 (01) : 39 - 62
  • [49] Waschneck B., 2017, CEUR WORKSHOP PROC
  • [50] Industry 4.0: state of the art and future trends
    Xu, Li Da
    Xu, Eric L.
    Li, Ling
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (08) : 2941 - 2962