Modular Construction: Determining Decision-Making Factors and Future Research Needs

被引:89
作者
Abdul Nabi, Mohamad [1 ]
El-adaway, Islam H. [2 ,3 ,4 ,5 ]
机构
[1] Missouri Univ Sci & Technol, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[2] Missouri Univ Sci & Technol, Construct Engn & Management, Rolla, MO 65409 USA
[3] Missouri Univ Sci & Technol, Civil Engn, Rolla, MO 65409 USA
[4] Missouri Univ Sci & Technol, Missouri Consortium Construct Innovat, Dept Civil Architectural & Environm Engn, Rolla, MO 65409 USA
[5] Missouri Univ Sci & Technol, Dept Engn Management & Syst Engn, Rolla, MO 65409 USA
关键词
OFFSITE CONSTRUCTION; ON-SITE; PREFABRICATION; SYSTEM; SELECTION; BARRIERS; CRITERIA; OPTIMIZATION; UNCERTAINTY; SIMULATION;
D O I
10.1061/(ASCE)ME.1943-5479.0000859
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With a compound annual growth rate of 5.69%, the modular construction market is forecasted to increase to a market value of $154.8 million by the end of 2023. Traditional stick-built construction and modular construction differ in many aspects including design, engineering, collaboration requirements, logistics, and others. Available research efforts tried to study and model the complex modular construction processes. However, they seemed to fall short in investigating modular construction processes in a comprehensive and holistic manner. In effect, the currently used decision-making models and processes for modular construction do not necessarily reflect the diverse and multiple interconnected and associated factors. This paper develops a comprehensive list of decision factors as well as determines future research needs for modular construction. As such, the authors (1) conducted a systematic literature review and analysis of modular construction studies that were conducted between 2009 and 2019, (2) highlighted the broad factors affecting decision-making in modular construction projects, and (3) utilized social network analysis (SNA) to quantitatively identify the literature gaps and strengths and create a roadmap for the factors that need further investigation. This paper identified 50 decision factors affecting the various modular construction operations in the construction industry. Consequently, it was revealed that there are some understudied decision factors, including those related to legal and regulatory considerations, material and construction waste management, green practices, as well as commissioning and testing. Further, it was shown that there is an explicit absence of the decision models and frameworks that simultaneously incorporate all the identified decision factors. Accordingly, this study provides a substantiated foundation for comprehensive decision-making processes for modular construction. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:21
相关论文
共 118 条
  • [91] Near optimum selection of module configuration for efficient modular construction
    Salama, Tarek
    Salah, Ahmad
    Moselhi, Osama
    Al-Hussein, Mohamed
    [J]. AUTOMATION IN CONSTRUCTION, 2017, 83 : 316 - 329
  • [92] Managing risk in modular construction using dimensional and geometric tolerance strategies
    Shahtaheri, Yasaman
    Rausch, Christopher
    West, Jeffrey
    Haas, Carl
    Nahangi, Mohammad
    [J]. AUTOMATION IN CONSTRUCTION, 2017, 83 : 303 - 315
  • [93] Interlocking system for enhancing the integrity of multi-storey modular buildings
    Sharafi, Pezhman
    Mortazavi, Mina
    Samali, Bijan
    Ronagh, Hamid
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 85 : 263 - 272
  • [94] Smith Steve., 2011, T4T DISCIPLESHIP RE
  • [95] Cluster Analysis of the Intellectual Structure of PPP Research
    Song, Jinbo
    Li, Yi
    Feng, Zhuo
    Wang, Huanming
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
  • [96] Statista, 2019, CONSTR IND SPEND WOR
  • [97] Sundukovskiy S., 2018, USING TECHNOLOGY DEA
  • [98] Swistun M., 2018, Offsite Construction - Why it is important for the Survival of Your Firm
  • [99] Simulation-Based Multiagent Approach for Scheduling Modular Construction
    Taghaddos, Hosein
    Hermann, Ulrich
    AbouRizk, Simaan
    Mohamed, Yasser
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 263 - 274
  • [100] Prefabrication as a mean of minimizing construction waste on site
    Tam, Vivian W. Y.
    Hao, Jane J. L.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2014, 14 (02) : 113 - 121