共 50 条
- [31] Three-machine no-wait flowshop with separate setup and removal times to minimize total completion time INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2004, 11 (02): : 113 - 123
- [33] Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times PROCEEDINGS OF THE 2004 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2004, : 1412 - 1416