Research on Maintenance Strategy Evaluation Method for Power Equipment through Experimental Verification

被引:0
作者
Li Guanglei [1 ]
Wang Chunlin [2 ]
Wu Tao [3 ]
Ma Mengchao [4 ]
Guo Deqiang [5 ]
机构
[1] State Grid Shandong Elect Power Res Inst, Jinan, Peoples R China
[2] State Grid Linyi Power Supply Co, Linyi, Peoples R China
[3] State Grid Jibei Elect Power Res Inst Co Ltd, Beijing, Peoples R China
[4] State Grid China Technol Coll, Jinan, Peoples R China
[5] Shandong Luneng Software Technol Co Ltd, Jinan, Peoples R China
来源
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY, ENVIRONMENT AND CHEMICAL ENGINEERING | 2015年 / 23卷
关键词
system risk; power transmission and transformation equipment; maintenance plan;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A maintenance schedule evaluation method for transmission and transformation equipment considering operation risk of power system is presented. The Sequential Monte Carlo simulation is used to solve probability problems. Considering the effects of equipment maintenance, a liner programming model is made for each feasible system state randomly generated and solved by primal-dual method with infeasible initial points. The power system of Zibo is used as an example to verify the validity of the model and arithmetic presented in the paper.
引用
收藏
页码:147 / 150
页数:4
相关论文
共 11 条