Large-watershed flood forecasting with high-resolution distributed hydrological model

被引:49
|
作者
Chen, Yangbo [1 ]
Li, Ji [1 ]
Wang, Huanyu [1 ]
Qin, Jianming [1 ]
Dong, Liming [1 ]
机构
[1] Sun Yat Sen Univ, Dept Water Resources & Environm, Guangzhou 510275, Guangdong, Peoples R China
基金
美国国家科学基金会;
关键词
COVER CHARACTERISTICS DATABASE; ALERT SYSTEM; SURFACE; RIVER; CALIBRATION; RUNOFF; URBANIZATION; EUROPEEN; SHE;
D O I
10.5194/hess-21-735-2017
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
A distributed hydrological model has been successfully used in small-watershed flood forecasting, but there are still challenges for the application in a large watershed, one of them being the model's spatial resolution effect. To cope with this challenge, two efforts could be made; one is to improve the model's computation efficiency in a large watershed, the other is implementing the model on a highperformance supercomputer. This study sets up a physically based distributed hydrological model for flood forecasting of the Liujiang River basin in south China. Terrain data digital elevation model (DEM), soil and land use are downloaded from the website freely, and the model structure with a high resolution of 200m x 200m grid cell is set up. The initial model parameters are derived from the terrain property data, and then optimized by using the Particle Swarm Optimization (PSO) algorithm; the model is used to simulate 29 observed flood events. It has been found that by dividing the river channels into virtual channel sections and assuming the cross section shapes as trapezoid, the Liuxihe model largely increases computation efficiency while keeping good model performance, thus making it applicable in larger watersheds. This study also finds that parameter uncertainty exists for physically deriving model parameters, and parameter optimization could reduce this uncertainty, and is highly recommended. Computation time needed for running a distributed hydrological model increases exponentially at a power of 2, not linearly with the increasing of model spatial resolution, and the 200m x 200m model resolution is proposed for modeling the Liujiang River basin flood with the Liuxihe model in this study. To keep the model with an acceptable performance, minimum model spatial resolution is needed. The suggested threshold model spatial resolution for modeling the Liujiang River basin flood is a 500m x 500m grid cell, but the model spatial resolution with a 200m x 200m grid cell is recommended in this study to keep the model at a better performance.
引用
收藏
页码:735 / 749
页数:15
相关论文
共 50 条
  • [41] A fast high resolution distributed hydrological model for forecasting, climate scenarios and digital twin applications using wflow_sbm
    Imhoff, Ruben O.
    Buitink, Joost
    Verseveld, Willem J. van
    Weerts, Albrecht H.
    ENVIRONMENTAL MODELLING & SOFTWARE, 2024, 179
  • [42] Coupling between weather radar rainfall data and a distributed hydrological model for real-time flood forecasting
    Zhijia, Li
    Wenzhong, Ge
    Jintao, Liu
    Kun, Zhao
    Hydrological Sciences Journal, 2004, 49 (06) : 945 - 958
  • [43] Coupling between weather radar rainfall data and a distributed hydrological model for real-time flood forecasting
    Li, ZJ
    Ge, WZ
    Liu, JT
    Zhao, K
    HYDROLOGICAL SCIENCES JOURNAL-JOURNAL DES SCIENCES HYDROLOGIQUES, 2004, 49 (06): : 945 - 958
  • [44] COUPLING A DISTRIBUTED HYDROLOGICAL MODEL WITH A HYDRAULIC MODEL FOR FLOOD INUNDATION SIMULATIONS
    Slamet, Nuryanto Sasmito
    Wang, Lei
    Koike, Toshio
    Jaranilla-Sanchez, Patricia Ann
    PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4786 - 4794
  • [45] High-resolution precipitation estimates for hydrological uses
    Harrison, D. L.
    Scovell, R. W.
    Kitchen, M.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MANAGEMENT, 2009, 162 (02) : 125 - 135
  • [46] Inter-comparison of high-resolution gridded climate data sets and their implication on hydrological model simulation over the Athabasca Watershed, Canada
    Eum, Hyung-Il
    Dibike, Yonas
    Prowse, Terry
    Bonsal, Barrie
    HYDROLOGICAL PROCESSES, 2014, 28 (14) : 4250 - 4271
  • [47] Flood forecasting with a dam watershed event-based hydrological model in a semi-arid context: case study in Morocco
    Laassilia, Oussama
    Saghiry, Soumia
    Ouazar, Driss
    Bouziane, Ahmed
    Hasnaoui, Moulay Driss
    WATER PRACTICE AND TECHNOLOGY, 2022, 17 (04) : 817 - 834
  • [48] Distributed Visual Analytics on Large-Scale High-Resolution Displays
    Schmauder, Hansjoerg
    Mueller, Christoph
    Burch, Michael
    Weiskopf, Daniel
    2015 BIG DATA VISUAL ANALYTICS (BDVA), 2015,
  • [49] Flash flood forecasting within the PREVIEW project: value of high-resolution hydrometeorological coupled forecast
    B. Vincendon
    V. Ducrocq
    S. Dierer
    V. Kotroni
    M. Le Lay
    M. Milelli
    A. Quesney
    G.-M. Saulnier
    D. Rabuffetti
    L. Bouilloud
    K. Chancibault
    S. Anquetin
    K. Lagouvardos
    P. Steiner
    Meteorology and Atmospheric Physics, 2009, 103 : 115 - 125
  • [50] Application of Distributed Hydrological Model in Flood Forecast of Huanglongtan Reservoir
    Chen, Jijie
    Wang, Liping
    Xu, Anna
    Zhao, Bikui
    PROCEEDINGS OF THE 35TH IAHR WORLD CONGRESS, VOLS III AND IV, 2013,