Identification and resolution of work space conflicts in building construction

被引:99
作者
Guo, SJ [1 ]
机构
[1] Natl Taiwan Univ, Dept Civil Engn, Taipei 106, Taiwan
关键词
workspace; construction management; buildings;
D O I
10.1061/(ASCE)0733-9364(2002)128:4(287)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Numerous workers, equipment, material, temporary facilities, as well as permanent structures share the limited space during construction. Since space constraints may affect productivity and the critical path, it is essential to organize the available space efficiently and minimize space conflicts. This study considers space availability due to time and scheduling, productivity loss due to space constraints and path interference, as well as the possibility of alternative space to resolve these conflicts and optimize space usage. Herein, computer-aided design is integrated with scheduling software for the dynamic identification of space conflicts on the jobsite. Follow-up supplemental decision criteria are then provided for conflict analysis and resolution. A prototype decision support system that combines the criteria was developed to solve this significant and complex problem more efficiently and precisely. A case study demonstrates the use and development of this system, which is very helpful to engineers and project managers.
引用
收藏
页码:287 / 295
页数:9
相关论文
共 15 条
  • [1] Akinci B, 1998, COMPUTING IN CIVIL ENGINEERING, P342
  • [2] AKINCI B, 1998, P 6 ANN C INT GROUP, P1
  • [3] ArcSite: Enhanced GIS for construction site layout
    Cheng, MY
    OConnor, JT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (04): : 329 - 336
  • [4] EvoSite: Evolution-based model for site layout planning
    Hegazy, T
    Elbeltagi, E
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1999, 13 (03) : 198 - 206
  • [5] Site-level facilities layout using genetic algorithms
    Li, H
    Love, PED
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 1998, 12 (04) : 227 - 231
  • [6] An interactive planning environment for critical operations
    Lin, KL
    Haas, CT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 212 - 222
  • [7] Riley DR, 1998, COMPUTING IN CIVIL ENGINEERING, P354
  • [8] Space planning method for multistory building construction
    Riley, DR
    Sanvido, VE
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (02): : 171 - 180
  • [9] PATTERNS OF CONSTRUCTION-SPACE USE IN MULTISTORY BUILDINGS
    RILEY, DR
    SANVIDO, VE
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04): : 464 - 473
  • [10] MODELING WORK SPACE TO SCHEDULE REPETITIVE FLOORS IN MULTISTORY BUILDINGS
    THABET, WY
    BELIVEAU, YJ
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (01): : 96 - 116