Reliability with finite buffer size for a multistate manufacturing system with parallel production lines

被引:9
作者
Chang, Ping-Chen [1 ]
机构
[1] Natl Quemoy Univ, Dept Ind Engn & Management, Kinmen Cty 892, Taiwan
关键词
Buffer reliability; finite buffer size; buffer usage matrix (BUM); system reliability; PERFORMANCE EVALUATION; LOGISTICS SYSTEMS; ROUTING SCHEME; FAILURE RATES; FLOW NETWORKS; REWORKING; COST;
D O I
10.1080/02533839.2017.1318719
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study examines system reliability for a manufacturing system with parallel production lines by creating a model of a multistate manufacturing system (MMS). System reliability is defined as the probability of demand satisfaction, which reflects the probability that the current capacity state of the MMS can successfully process a given demand. In particular, a buffer station with a finite size is taken into consideration to avoid blockage and starvation in the MMS. To the best of our knowledge, there is no existing research that considers a finite buffer size in a model of an MMS with parallel production lines. This study proceeds through the following phases. (i) In the model construction phase, the amount of input material, workload, and minimal capacity required by each workstation to satisfy a given demand level are studied by flow analysis; subsequently, a buffer usage matrix (BUM) is proposed to calculate buffer reliability. (ii) In the performance evaluation phase, system reliabilities with both infinite and finite buffer sizes are derived in terms of both minimal capacity vector and buffer reliability. (iii) In the case demonstration phase, two examples are utilized to illustrate the proposed method. Results of both examples show that the system reliability is overestimated with an infinite buffer size.
引用
收藏
页码:275 / 283
页数:9
相关论文
共 24 条
[1]   Group technology in a hybrid flowshop environment:: A case study [J].
Andrés, C ;
Albarracín, JM ;
Tormo, G ;
Vicens, E ;
García-Sabater, JP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :272-281
[2]  
[Anonymous], 1962, FLOWS IN NETWORK
[3]   A multi-objective optimization problem for multi-state series-parallel systems: A two-stage flow-shop manufacturing system [J].
Azadeh, A. ;
Shoja, B. Maleki ;
Ghanei, S. ;
Sheikhalishahi, M. .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 136 :62-74
[4]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[5]   The state of the art on buffer allocation problem: a comprehensive survey [J].
Demir, Leyla ;
Tunali, Semra ;
Eliiyi, Deniz Tursel .
JOURNAL OF INTELLIGENT MANUFACTURING, 2014, 25 (03) :371-392
[6]   System Performance and Reliability Modeling of a Stochastic-Flow Production Network: A Confidence-Based Approach [J].
Fiondella, Lance ;
Lin, Yi-Kuei ;
Chang, Ping-Chen .
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (11) :1437-1447
[7]   Routing scheme of a multi-state computer network employing a retransmission mechanism within a time threshold [J].
Huang, Cheng-Fu ;
Lin, Yi-Kuei ;
Yeng, Louis Cheng-Lu .
INFORMATION SCIENCES, 2016, 340 :321-336
[8]   Evaluating cost and reliability integrated performance of stochastic logistics systems [J].
Jane, Chin-Chia ;
Laih, Yih-Wenn .
NAVAL RESEARCH LOGISTICS, 2012, 59 (07) :577-586
[9]   Performance evaluation of logistics systems under cost and reliability considerations [J].
Jane, Chin-Chia .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2011, 47 (02) :130-137
[10]   Reliability evaluation of capacitated-flow networks with budget constraints [J].
Lin, JS .
IIE TRANSACTIONS, 1998, 30 (12) :1175-1180