Multiple-objective scheduling for the hierarchical control of flexible manufacturing systems

被引:38
|
作者
Tung, LF [1 ]
Lin, L [1 ]
Nagi, R [1 ]
机构
[1] SUNY Buffalo, Dept Ind Engn, Buffalo, NY 14260 USA
来源
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS | 1999年 / 11卷 / 04期
关键词
flexible manufacturing systems; hierarchical scheduling; multiple objectives;
D O I
10.1023/A:1008183330452
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a hierarchical approach to scheduling flexible manufacturing systems (FMSs) that pursues multiple performance objectives and considers the process flexibility of incorporating alternative process plans and resources for the required operations. The scheduling problem is solved at two levels: the shop level and the manufacturing system level. The shop level controller employs a combined priority index developed in this research to rank shop production orders in meeting multiple scheduling objectives. To overcome dimensional complexity and keep a low level of work-in-process inventory, the shop controller first selects up to three production orders with the highest ranking as candidates and generates all possible release sequences for them, with or without multitasking. These sequences are conveyed to the manufacturing system controller, who then performs detailed scheduling of the machines in the FMS using a fixed priority heuristic for routing parts of multiple types while considering alternative process plans and resources for the operations. The FMS controller provides feedback to the shop controller with a set of suggested detailed schedules and projected order completion times. On receiving these results, the shop controller further evaluates each candidate schedule using a multiple-objective function and selects the best schedule for execution. This allows multiple performance objectives of an FMS to be achieved by the integrated hierarchical scheduling approach.
引用
收藏
页码:379 / 409
页数:31
相关论文
共 50 条
  • [31] The Method of Optimization for Control of Flexible Manufacturing Systems
    Fota, Adriana
    Barabas, Sorin Adrian
    ADVANCES IN MANUFACTURING ENGINEERING, QUALITY AND PRODUCTION SYSTEMS, VOL II, 2009, : 358 - 364
  • [32] Hybrid Control Models for Flexible Manufacturing Systems
    Mic, L.
    Fat, R.
    Santa, M. M.
    Letia, T. S.
    2018 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION, QUALITY AND TESTING, ROBOTICS (AQTR), 2018,
  • [33] An integrated control framework for flexible manufacturing systems
    Nebil Buyurgan
    Can Saygin
    The International Journal of Advanced Manufacturing Technology, 2006, 27 : 1248 - 1259
  • [34] PETRI-NET BASED PROCESS SCHEDULING - A MODEL OF THE CONTROL-SYSTEM OF FLEXIBLE MANUFACTURING SYSTEMS
    CAMURRI, A
    FRANCHI, P
    GANDOLFO, F
    ZACCARIA, R
    JOURNAL OF INTELLIGENT & ROBOTIC SYSTEMS, 1993, 8 (01) : 99 - 123
  • [35] Real-time scheduling with deadlock avoidance in flexible manufacturing systems
    ElMekkawy, TY
    ElMaraghy, HA
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (3-4) : 259 - 270
  • [36] Real-time scheduling with deadlock avoidance in flexible manufacturing systems
    Tarek Y. ElMekkawy
    Hoda A. ElMaraghy
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 259 - 270
  • [37] Stable real-time multimodel scheduling for flexible manufacturing systems
    Fenchel, J
    Chen, YH
    IEEE-ASME TRANSACTIONS ON MECHATRONICS, 1997, 2 (01) : 8 - 21
  • [38] Online Scheduling of 2-Re-entrant Flexible Manufacturing Systems
    Van Pinxten, Joost
    Waqas, Umar
    Geilen, Marc
    Basten, Twan
    Somers, Lou
    ACM TRANSACTIONS ON EMBEDDED COMPUTING SYSTEMS, 2017, 16
  • [39] A Survey of Solving Approaches for Multiple Objective Flexible Job Shop Scheduling Problems
    Genova, Krasimira
    Kirilov, Leoneed
    Guliashki, Vassil
    CYBERNETICS AND INFORMATION TECHNOLOGIES, 2015, 15 (02) : 3 - 22
  • [40] A distributed transient inter-production scheduling for flexible manufacturing systems
    Driss, Olfa Belkahla
    Korbaa, Ouajdi
    Ghedira, Khaled
    Yim, Pascal
    Journal Europeen des Systemes Automatises, 2007, 41 (01): : 101 - 123