This paper presents a hierarchical approach to scheduling flexible manufacturing systems (FMSs) that pursues multiple performance objectives and considers the process flexibility of incorporating alternative process plans and resources for the required operations. The scheduling problem is solved at two levels: the shop level and the manufacturing system level. The shop level controller employs a combined priority index developed in this research to rank shop production orders in meeting multiple scheduling objectives. To overcome dimensional complexity and keep a low level of work-in-process inventory, the shop controller first selects up to three production orders with the highest ranking as candidates and generates all possible release sequences for them, with or without multitasking. These sequences are conveyed to the manufacturing system controller, who then performs detailed scheduling of the machines in the FMS using a fixed priority heuristic for routing parts of multiple types while considering alternative process plans and resources for the operations. The FMS controller provides feedback to the shop controller with a set of suggested detailed schedules and projected order completion times. On receiving these results, the shop controller further evaluates each candidate schedule using a multiple-objective function and selects the best schedule for execution. This allows multiple performance objectives of an FMS to be achieved by the integrated hierarchical scheduling approach.
引用
收藏
页码:379 / 409
页数:31
相关论文
共 50 条
  • [1] Multiple-Objective Scheduling for the Hierarchical Control of Flexible Manufacturing Systems
    Ling-Feng Tung
    Li Lin
    Rakesh Nagi
    International Journal of Flexible Manufacturing Systems, 1999, 11 : 379 - 409
  • [2] A HIERARCHICAL MODEL FOR CONTROL OF FLEXIBLE MANUFACTURING SYSTEMS
    SODHI, MS
    ASKIN, RG
    SEN, S
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (10) : 1185 - 1196
  • [3] Scheduling and Control of Flexible Manufacturing Systems: a Holonic Approach
    Arauzo, J. A.
    del-Olmo-Martinez, R.
    Lavios, J. J.
    de-Benito-Martin, J. J.
    REVISTA IBEROAMERICANA DE AUTOMATICA E INFORMATICA INDUSTRIAL, 2015, 12 (01): : 58 - 68
  • [4] Scheduling flexible manufacturing systems using parallelization of multi-objective evolutionary algorithms
    Sankar, S. Saravana
    Ponnambalam, S.G.
    Gurumarimuthu, M.
    International Journal of Advanced Manufacturing Technology, 2006, 30 (3-4): : 279 - 285
  • [5] An architecture for scheduling and control in flexible manufacturing systems using distributed objects
    Tai, TT
    Boucher, TO
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (04): : 452 - 462
  • [6] A genetic algorithm for scheduling flexible manufacturing systems
    Jawahar, N
    Aravindan, P
    Ponnambalam, SG
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1998, 14 (08) : 588 - 607
  • [7] A genetic algorithm for scheduling flexible manufacturing systems
    N. Jawahar
    P. Aravindan
    S. G. Ponnambalam
    The International Journal of Advanced Manufacturing Technology, 1998, 14 : 588 - 607
  • [8] PRIORITY NETS FOR SCHEDULING FLEXIBLE MANUFACTURING SYSTEMS
    RAJU, KR
    CHETTY, OVK
    JOURNAL OF MANUFACTURING SYSTEMS, 1993, 12 (04) : 326 - 340
  • [9] Maintenance scheduling and production control of multiple-machine manufacturing systems
    Gharbi, A
    Kenné, JP
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (04) : 693 - 707
  • [10] Scheduling of complex flexible manufacturing systems - Methodology design
    Katalinic, B
    Balic, J
    Pahole, I
    STROJNISKI VESTNIK-JOURNAL OF MECHANICAL ENGINEERING, 1998, 44 (5-6): : 168 - 174