A tool to test and validate algorithms for the resource-constrained project scheduling problem

被引:42
|
作者
Vanhoucke, Mario [1 ,2 ,3 ]
Coelho, Jose [1 ,4 ,5 ]
机构
[1] Univ Ghent, Tweekerkenstr 2, B-9000 Ghent, Belgium
[2] Vlerick Business Sch, Reep 1, B-9000 Ghent, Belgium
[3] UCL, Sch Management, 1 Canada Sq, London E14 5AA, England
[4] INESC Technol & Sci, Porto, Portugal
[5] Univ Aberta, Rua Escola Politecn 147, P-1269001 Lisbon, Portugal
关键词
Project data; Resource-constrained project scheduling; Best known solutions; SAT SOLVERS; HEURISTICS; NETWORKS; RCPSP;
D O I
10.1016/j.cie.2018.02.001
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In a paper written by by Vanhoucke et al. (2016), an overview of artificial and empirical project databases has been given for integrated project management and control. These databases are collections of the most wellknown and widespread data instances available in literature for the construction of a baseline schedule, the analysis of schedule risk or the use for project control. The current paper serves as a follow-up study to further elaborate on the use of these data instances, and to give researchers an incentive to use these datasets for their research on the development and validation of new algorithms for project scheduling. Therefore, unlike the general focus of the previous paper on baseline scheduling, schedule risk analysis and project control, the focus on the current paper is restricted to resource-constrained project scheduling. The intention of this follow-up overview is fourfold. First and foremost, a procedure is proposed to facilitate the reporting of best known solutions for the well-known single- and multi-mode resource-constrained project scheduling problem to minimize the project makespan. Secondly, the paper reports our best known solutions we obtained so far, and reflects on the network and resource parameters that increase the project complexity. In doing so, areas to focus on for future research are detected, and an attempt to define hard problem instances is given. Thirdly, a new dataset is presented for the resource-constrained project scheduling problem that is much more diverse in both the network topology and resource scarceness and will enable the future researcher to develop algorithms to solve a wider range of project problems. Finally, the paper also adds some links to tutorials and other relevant information to stimulate researchers to download the data and update best known solutions once available.
引用
收藏
页码:251 / 265
页数:15
相关论文
共 50 条
  • [21] A competitive Genetic Algorithm for resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 2945 - 2949
  • [22] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [23] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [24] The Resource-constrained Project Scheduling Problem with Stochastic Activity Durations
    Creemers, S.
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 453 - 457
  • [25] New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms
    Coelho, Jose
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2023, 153
  • [26] A survey of variants and extensions of the resource-constrained project scheduling problem
    Hartmann, Soenke
    Briskorn, Dirk
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 1 - 14
  • [27] Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
    Gomes, Helton Cristiano
    das Neves, Francisco de Assis
    Freitas Souza, Marcone Jamilson
    COMPUTERS & OPERATIONS RESEARCH, 2014, 44 : 92 - 104
  • [28] An exact composite lower bound strategy for the resource-constrained project scheduling problem
    Coelho, Jose
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2018, 93 : 135 - 150
  • [29] A hybrid projection method for resource-constrained project scheduling problem under uncertainty
    Aramesh, Saeed
    Aickelin, Uwe
    Khorshidi, Hadi Akbarzadeh
    NEURAL COMPUTING & APPLICATIONS, 2022, 34 (17) : 14557 - 14576
  • [30] Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem
    Chu, Zihao
    Xu, Zhe
    Xie, Fang
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 44 (03) : 2503 - 2517