Single machine batch processing problem with release dates to minimize total completion time

被引:13
作者
Beldar, Pedram [1 ]
Costa, Antonio [2 ]
机构
[1] Islamic Azad Univ, Qazvin Branch, Dept Ind & Mech Engn, Qazvin, Iran
[2] Univ Catania, DICAR, Viale Andrea Doria 6, I-95125 Catania, Italy
关键词
Minimization of total completion time; Batch processing; Single machine scheduling; Mathematical programming; Scheduling with release dates; HYBRID PARTICLE-SWARM; NONIDENTICAL JOB SIZES; MAKESPAN MINIMIZATION; TABU SEARCH; OPTIMIZATION; TARDINESS; ALGORITHM; EARLINESS; COLONY;
D O I
10.5267/j.ijiec.2017.8.003
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A single machine batch processing problem with release dates to minimize the total completion time (1 vertical bar r(j),batch vertical bar Sigma C-j ) is investigated in this research. An original mixed integer linear programming (MILP) model is proposed to optimally solve the problem. Since the research problem at hand is shown to be NP-hard, several different meta-heuristic algorithms based on tabu search (TS) and particle swarm optimization (PSO) are used to solve the problem. To find the most performing heuristic optimization technique, a set of test cases ranging in size (small, medium, and large) are randomly generated and solved by the proposed meta-heuristic algorithms. An extended comparison analysis is carried out and the outperformance of a hybrid meta-heuristic technique properly combining PSO and genetic algorithm (PSO-GA) is statistically demonstrated. (C) 2018 Growing Science Ltd. All rights reserved
引用
收藏
页码:331 / 348
页数:18
相关论文
共 43 条
[1]   Constrained binary artificial bee colony to minimize the makespan for single machine batch processing with non-identical job sizes [J].
Al-Salamah, Muhammad .
APPLIED SOFT COMPUTING, 2015, 29 :379-385
[2]  
[Anonymous], 2013, Evolutionary Optimization Algorithms
[3]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN
[4]   Minimization of weighted earliness and tardiness for no-wait sequence-dependent setup times flowshop scheduling problem [J].
Arabameri, Sedighe ;
Salmasi, Nasser .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (04) :902-916
[5]   MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES [J].
CHANDRU, V ;
LEE, CY ;
UZSOY, R .
OPERATIONS RESEARCH LETTERS, 1993, 13 (02) :61-65
[6]   A heuristic for a batch processing machine scheduled to minimise total completion time with non-identical job sizes [J].
Chang, PC ;
Wang, HM .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (7-8) :615-620
[7]   A hybrid approach based on the variable neighborhood search and particle swarm optimization for parallel machine scheduling problems-A case study for solar cell industry [J].
Chen, Yin-Yann ;
Cheng, Chen-Yang ;
Wang, Li-Chih ;
Chen, Tzu-Li .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) :66-78
[8]  
Corder GW., 2014, NONPARAMETRIC STAT S
[9]   Minimizing the total completion time on a parallel machine system with tool changes [J].
Costa, A. ;
Cappadonna, F. A. ;
Fichera, S. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 91 :290-301
[10]   A parallel tabu search for solving the primal buffer allocation problem in serial production systems [J].
Costa, A. ;
Alfieri, A. ;
Matta, A. ;
Fichera, S. .
COMPUTERS & OPERATIONS RESEARCH, 2015, 64 :97-112