Integrated cross-supplier order and logistic scheduling in cloud manufacturing

被引:22
作者
Wu, Qiao [1 ]
Xie, Naiming [1 ]
Zheng, Shaoxiang [1 ]
机构
[1] Nanjing Univ Aeronaut & Astronaut, Coll Econ & Management, Nanjing, Peoples R China
基金
中国国家自然科学基金;
关键词
Cloud manufacturing; integrated scheduling; logistic scheduling; order allocation; improved shuffled frog-leaping algorithm;
D O I
10.1080/00207543.2020.1867921
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In the cloud manufacturing environment, integrated cross-supplier order and logistic scheduling can benefit both suppliers and third-party logistics, significantly reduce their production and transport costs to improve the overall efficiency of the supply chain. This paper aims to construct a hybrid solution with both cross-supplier order assignments and third-party logistics scheduling under a centralised scheduling mode of cloud manufacturing platform, which is defined as an integrated cross-supplier order and logistic scheduling (ICSOLS) problem. Since the problem is NP-hard, a strategy based on an improved shuffled frog-leaping algorithm was developed for solving the model. A numerical case was designed for demonstrating the modelling process and analysing results. Different scales of simulations are designed to verify validity and robustness. Results show the proposed approach and algorithm can solve the defined problem efficiently.
引用
收藏
页码:1633 / 1649
页数:17
相关论文
共 38 条
  • [1] Cloud manufacturing - a critical review of recent development and future trends
    Adamson, Goran
    Wang, Lihui
    Holm, Magnus
    Moore, Philip
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2017, 30 (4-5) : 347 - 380
  • [2] A novel model for optimisation of logistics and manufacturing operation service composition in Cloud manufacturing system focusing on cloud-entropy
    Aghamohammathadeh, Ehsan
    Malek, Mahsa
    Valilai, Omid Fatahi
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (07) : 1987 - 2015
  • [3] Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm
    Amirian, Homa
    Sahraeian, Rashed
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 107 : 141 - 149
  • [4] A classification-based approach for integrated service matching and composition in cloud manufacturing
    Bouzary, Hamed
    Chen, F. Frank
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2020, 66
  • [5] A shuffled frog-leaping algorithm with memeplex quality for bi-objective distributed scheduling in hybrid flow shop
    Cai, Jingcao
    Lei, Deming
    Li, Ming
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (18) : 5404 - 5421
  • [6] A TQCS-based service selection and scheduling strategy in cloud manufacturing
    Cao, Yang
    Wang, Shilong
    Kang, Ling
    Gao, Yuan
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 82 (1-4) : 235 - 251
  • [7] Delaram J., 2018, 28 INT C FLEX AUT IN
  • [8] A novel hybrid of Shortest job first and round Robin with dynamic variable quantum time task scheduling technique
    Elmougy, Samir
    Sarhan, Shahenda
    Joundy, Manar
    [J]. JOURNAL OF CLOUD COMPUTING-ADVANCES SYSTEMS AND APPLICATIONS, 2017, 6
  • [9] Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization
    Eusuff, M
    Lansey, K
    Pasha, F
    [J]. ENGINEERING OPTIMIZATION, 2006, 38 (02) : 129 - 154
  • [10] Assessing the performances of a novel decentralised scheduling approach in Industry 4.0 and cloud manufacturing contexts
    Grassi, Andrea
    Guizzi, Guido
    Santillo, Liberatina Carmela
    Vespoli, Silvestro
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (20) : 6034 - 6053