Computational Model for Measuring Project Complexity in Construction

被引:0
|
作者
Nguyen, Long D. [1 ]
Tran, Dai Q. [2 ]
Nguyen, An T. [3 ]
Long Le-Hoai [3 ]
机构
[1] Florida Gulf Coast Univ, Dept Environm & Civil Engn, Ft Myers, FL 33965 USA
[2] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[3] HCMC Univ Technol, Fac Civil Engn, Ho Chi Minh City, Vietnam
来源
2016 ANNUAL CONFERENCE OF THE NORTH AMERICAN FUZZY INFORMATION PROCESSING SOCIETY (NAFIPS) | 2016年
关键词
ANALYTIC HIERARCHY PROCESS; FUZZY;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
As construction projects are increasingly complex, a systematic approach for assessing their complexity is imperative. The Fuzzy Analytic Hierarchy Process (Fuzzy AHP) method was employed to determine the local and global weights of the criteria and sub-criteria in project complexity. The overall project complexity is quantified by a proposed measure, named complexity level (CL). A computational model was developed in MATLAB to facilitate calculations in Fuzzy AHP, conduct sensitivity analysis, and visualize results. The application of the model was illustrated in a case study of three transportation projects performed by a heavy construction company. The proposed complexity level enables engineers and managers to better anticipate potential difficulties in their complex construction projects. Scarce resources will be therefore allocated efficiently in various construction projects in a company's portfolio.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Application of Soft Computing to Address Uncertainty in Construction Project Management: A Systematic Literature Review
    Winarno, Setya
    Kusumadewi, Sri
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2024, 10 (06): : 2040 - 2065
  • [32] Selection of Production Reliability Indicators for Project Simulation Model
    Pusztai, Laszlo Peter
    Nagy, Lajos
    Budai, Istvan
    APPLIED SCIENCES-BASEL, 2022, 12 (10):
  • [33] Project management model for constructing a renewable energy plant
    Lee, Amy H. I.
    Kang, He-Yau
    Huang, Tzu-Ting
    13TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT, 2017, 174 : 145 - 154
  • [34] An economic-probabilistic model for project selection and prioritization
    Dutra, Camila Costa
    Ribeiro, Jose Luis Duarte
    de Carvalho, Many Monteiro
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (06) : 1042 - 1055
  • [35] An Intuitionistic Linguistic DEMATEL-Based Network Model for Effective National Defense and Force Innovative Project Planning
    Sun, Chia-Chi
    IEEE ACCESS, 2021, 9 : 130141 - 130153
  • [36] Application of intelligent teaching resource organisation model and construction of performance evaluation model
    Huang, Qiyi
    Zhao, Yan
    APPLIED MATHEMATICS AND NONLINEAR SCIENCES, 2022, 8 (02) : 241 - 250
  • [37] THE CONSTRUCTION OF ECONOMIC MODEL EVALUATION SYSTEM BASED ON THE ECONOMIC MODEL OF RESOURCE PLATFORM
    Ruan, Rong
    Zhang, Zhenji
    Meng, Jingjing
    ICEIS 2011: PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS, VOL 1, 2011, : 376 - 379
  • [38] Developing Ontological Model of Computational Linear Algebra - Preliminary Considerations
    Wasielewska, K.
    Ganzha, M.
    Paprzycki, M.
    Lirkov, I.
    APPLICATION OF MATHEMATICS IN TECHNICAL AND NATURAL SCIENCES, 2013, 1561 : 133 - 143
  • [39] Linguistic Computational Model Based on 2-Tuples and Intervals
    Dong, Yucheng
    Zhang, Guiqing
    Hong, Wei-Chiang
    Yu, Shui
    IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2013, 21 (06) : 1006 - 1018
  • [40] Identification and analysis of influencing factors on construction quality management for rural drinking water safety project
    Xu, Shuitai
    Chen, Meiling
    Zhou, Yuhui
    Wang, Yabo
    WATER SUPPLY, 2023, 23 (07) : 2814 - 2832