Research on the Influence of Risk on Construction Project Performance: A Systematic Review

被引:8
作者
Su, Guiliang [1 ]
Khallaf, Rana [2 ]
机构
[1] Guilin Univ Technol, Sch Civil & Architectural Engn, Smart Construct & Innovat Ctr, Guilin 541000, Peoples R China
[2] Future Univ Egypt, Dept Struct Engn & Construct Management, New Cairo 11835, Egypt
关键词
risk influence; construction project performance; contents analysis; method analysis; review; COST CONTINGENCY; SCHEDULE RISK; MANAGEMENT; METHODOLOGY; IMPACT; BIM;
D O I
10.3390/su14116412
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Knowledge on the influence of risk on project performance is an important part of risk management. Previous studies have concentrated on this area to identify risks in aspects of project performance such as cost and schedule. However, rare reviews have been conducted to fully report on the research on the influence of risk on project performance. For this reason, to identify and analyze such researches in these areas a systematic review was conducted in this paper. More specifically, 54 relevant articles were identified and classified into three groups according to their research contents; the research contents in each article and the research methods were reviewed, and the 13 most frequent research methods were also identified and discussed. It was found that most of the previous researches concentrated on developing tools or approaches to assess the influence of risk on project performance. Additionally, researches focused on risk factors' identification or risk interdependency modeling were also common, along with researches that investigated the cause of poor project performance, evaluated risk impact on cost contingency, discussed the risk response actions, and discussed what enables high-risk projects to yield a high return. However, four gaps were identified from these researches, namely: a need for improving the accuracy in quantitative research of the influence of risk on project performance; a need for novel research methodologies for conducting more accurate risk influence assessments; taking into consideration project participants' decision-making in their researches; and creating a framework that treats the risk influence assessment as a whole system. Besides that, since this research only focused on two project objectives (cost and schedule), recommendations for future research include expanding the focus to more project objectives.
引用
收藏
页数:19
相关论文
共 74 条
[1]   Risk-Based Approach to Predict the Cost Performance of Modularization in Construction Projects [J].
Abdul Nabi, Mohamad ;
El-adaway, Islam H. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (10)
[2]   Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects [J].
Afzal, Farman ;
Shao, Yunfei ;
Sajid, Muhammad ;
Afzal, Fahim .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (04) :825-849
[3]   Methodological Pluralism: Investigation into Construction Engineering and Management Research Methods [J].
Agyekum-Mensah, George ;
Reid, Andy ;
Temitope, Titiloye Ayodeji .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (03)
[4]   Evaluating impact of construction risks in the Arabian Gulf Region from perspective of multinational architecture, engineering and construction firms [J].
Al-Sabah, Ruqaya ;
Menassa, Carol C. ;
Hanna, Awad .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (04) :382-402
[5]  
[Anonymous], 2008, A Guide to the Project Management Body of Knowledge (PMBOK Guide), V4th
[6]  
[Anonymous], 2004, Keele University Technical Report
[7]   Predicting Project Performance in the Construction Industry [J].
Assaad, Rayan ;
El-Adaway, Islam H. ;
Abotaleb, Ibrahim S. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (05)
[8]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[9]   Dynamic Management of Cost Contingency: Impact of KPIs and risk perception [J].
Ayub, Bilal ;
Thaheem, Muhammad Jamaluddin ;
Din, Zia Ud .
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 :82-87
[10]   Bayesian network based decision support for predicting and mitigating delay risk in TBM tunnel projects [J].
Balta, G. C. Koseoglu ;
Dikmen, I ;
Birgonul, M. T. .
AUTOMATION IN CONSTRUCTION, 2021, 129